Council archive · source document
Part 11 of 37 Appendix 9 Ecological Assessment Report MCU12/0208
Very large file (123 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Noosa on Weyba
Ecological Assessment Report
(.J-’CardnO.
Lighting
>
lighting is located and orientated to minimise negative impacts on wildlife and
environmentally sensitive areas; and
> the vertical illuminationresulting from direct, reflected or other incidental light
emanating fromlighting does not, when measured at the boundary of
environmentally sensitive areas and protected estate boundaries at any level
from ground level upward, exceed the relevant lux levels specified in the
approved VFMMP.
5.7.3 Occupation Phase
Table 5-9 provides a non-exhaustive list of the biodiversity management issues and response measures that
are or relevance to the occupation phase of the Noosa on Weyba project.
Table 5-9 Occupation phase biodiversity management issues and measures
Management Issue
I Proposed Management Measures
Public ignorance and apathy As part of the Noosa on Weyba project a community education and stewardship
strategy will be developed and implemented to ensure that all residents and visitors
The presence of a
are aware of the biodiversity values of the Noosa on Weyba locality. This
substantial residential
community education and stewardship strategy will include provision for measures
population with a high such as the following.
degree of ignorance
concerning and/or apathy 1. Information packages for prospective residents concerning:
towards the biodiversity
values of the Noosa on a. the environmental values of the Noosa on Weyba site locality;
Weyba locality has the
b. specific design features of the Noosa on Weyba project that respond to
potential to undermine the
biodiversity management those important environmental values;
initiatives incorporated into
the design and construction
c. specific Body Corporate regulations and controls that residents and their
phases of the project. guests would need to comply with to ensure that important environmental
values are protected.
2. Issue of a regular (e.g. quarterly) Environmental Newsletter providing
information:
a. concerning notable environmental observation or events within the Noosa
on Weyba locality (e.g. commencement of Koala breeding season);
b. reminding residents of their environmental management obligations under
the Body Corporate regulations; and
c. contact details for the reporting of sick/injured wildlife or free-roaming dogs.
3. Initiation of a Noosa on Weyba Land Care Group (or similar) that is designed to
provide residents with the opportunity to become actively involved in the
monitoring and management of the biodiversity values of the Noosa on Weyba.
4. Establishment and maintenance of environmental interpretative signage
throughout the Noosa on Weyba project that provides residents and visitors
with information concerning the Koala ecology and conservation issues of
relevance to the Noosa on Weyba locality.
Domestic dogs In recognition of the potential impacts that an unregulated increase in the presence
of dogs may have on native fauna the following dog ownership controls are
The Noosa on Weyba
will result in proposed as an integral part of the Noosa on Weyba project.
project an
overall increase in the
1. Residents will be restricted to the ownership of dogs as approved in the
number of domestic dogs
present within the Noosa on Community Management Scheme (CMS) only, and those dogs must be
Northbrook Corporation Pty Ltd Version 1 30 November 2012
Ecological Assessment Report V1 30112012.docx Commercial in Confidence Page 40
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 11 of 37 Appendix 9 Ecological Assessment Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 123 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.