2302-33458 SRA - Response with conditions
Attached to the e-mail OPW23/0025 - SARA referral agency response.
2302-33458 SRA
Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the documents referenced below are found at Attachment 5)
No. Conditions Condition timing
Operational works
10.17.3.1.1 – Tidal works or works in a coastal management district —The chief executive
administering the Planning Act 2016 nominates the Director-General of the Department of Environment
and Science to be the enforcement authority for the development to which this development approval
relates for the administration and enforcement of any matter relating to the following conditions:
1. The tidal works must be undertaken generally in accordance with the For the duration of the
following plans: works.
General Arrangement and Longitudinal Section, prepared by
Projex Partners, dated 23/01/2023, drawing number 497-002-
C002, revision 1.
Typical Sections prepared by Projex Partners, dated 23/01/2023,
drawing number 497-002-C003, revision 1.
Cross sections, prepared by Projex Partners, dated 23/01/2023,
drawing number 497-002-C004, revision 1.
2. At all times.
Maintain the development in accordance with the plans referenced in
condition 1, and the requirements of any conditions included in this
referral agency response.
3. For the construction of the boat ramp upgrade only use clean For the duration of the
materials which are free from prescribed water contaminants. works.
4. Development must prevent the release of sediment to tidal waters by For the duration of the
installing and maintaining erosion and sediment control measures in works.
accordance with the Best Practice Erosion and Sediment Control
(BPESC) guidelines for Australia (International Erosion Control
Association).
5. Submit “As Constructed drawings” to [email protected] or mail Within 20 business
to: days of the completion
Department of Environment and Science of the works.
Permit and License Management
GPO Box 2454
Brisbane Qld 4001
6. a) In the event that the works cause disturbance or oxidisation of a) Upon disturbance
acid sulfate soil, the affected soil must be treated and thereafter or oxidisation until
managed (until the affected soil has been neutralised or the affected soil
contained) in accordance with the current Queensland Acid has been
Sulfate Soil Technical Manual: Soil management guidelines, neutralised or
prepared by the Department of Science, Information Technology, contained.
Innovation and the Arts, 2014. b) At the time the
soils have been
b) Certification by an appropriately qualified person, confirming that neutralised or
the affected soil has been neutralised or contained, in contained.
accordance with (a) above is to be provided to
[email protected] or mailed to:
State Assessment and Referral Agency Page 3 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.