Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2302-33458 SRA - Response with conditions

Attached to the e-mail OPW23/0025 - SARA referral agency response.

of 7

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                            2302-33458 SRA




             Department of Environment and Science
             Permit and Licence Management
             Implementation and Support Unit
             GPO Box 2454
             Brisbane Qld 4001

        Note: Appropriately qualified person means a person or persons who
        has professional qualifications, training, skills and experience
        relevant to soil chemistry or acid sulfate soil management and can
        give authoritative assessment, advice and analysis in relation to acid
        sulfate soil management using the relevant protocols, standards,
        methods or literature.
10.17.3.2.1 – Tidal works or works in a coastal management district - The chief executive
administering the Planning Act 2016 nominates the Director-General of the Department of Transport
and Main Roads to be the enforcement authority for the development to which this development
approval relates for the administration and enforcement of any matter relating to the following
conditions:
7.      The works must be carried out generally in accordance with the           For the duration of
        following plans:                                                         works.
         General Arrangement and Longitudinal Section, prepared by
             Projex Partners, dated 23/01/2023, drawing number 497-002-
             C002, revision 1.
         Typical Sections, prepared by Projex Partners, dated
             23/01/2023, drawing number 497-002-C003, revision 1.
         Cross sections, prepared by Projex Partners, dated 23/01/2023,
             drawing number 497-002-C004, revision 1.
8.      a) Light/mark all vessels, structures, plant and equipment               For the duration of
           associated with:                                                      works and for operation
           i. the works, in accordance with the following specifications:        to be maintained at all
           - any anchors deployed must be marked with yellow buoys and
                                                                                 times.
           fitted with FL yellow lights fitted.

        b) Lighting provided must not obscure, disguise or otherwise
           interfere with the safe navigation of other vessels, including the
           effectiveness of navigational lighting.




State Assessment and Referral Agency                                                           Page 4 of 7
Log in to download the original file

2302-33458 SRA - Response with conditions.pdf · 258 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.