Att 4 - Waste Management Plan.pdf
Attached to the e-mail Retail Bus Type 2 Shop & Salon, Multiple Housing Type 4 Conventional (2 units) & Boundary Realignment (3 lots into 3) - MCU18/0158 & RAL18/0017.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnWaste Management Plan for 34 Elm St, Cooroy 1.0 Purpose of The Waste Management Plan The purpose of this Waste Management Plan is to address waste minimisation and reuse of waste products generated as part of day to day operations of the neighbourhood centre. 2.0 Application of The Waste Management Plan This plan applies to all commercial uses within the neighbourhood centre. This plan is to be read in conjunction with the site plan prepared by Andrew Mckellar Design dated July 2018. 3.0 Demolition Waste Management Plan MATERIALS ON-SITE DESTINATION Re-use and Recycling Disposal Expected waste Estimated On-site Off-site *specify materials volume(m³) *specify proposed *specify contractor and re-use or on-site contractor and landfill site or recycling methods recycling outlet other disposal site Excavation Nil - - - material Green waste 2m3 Mulch or compost Mulch or compost Existing green waste and trees a Bricks 100m3 Re-use or crush for - Bricks to be removed landscaping and driveways site by demolition (where practicable) contractor to an approved facility Concrete and 300m3 Re-use for filling, levelling or - Concrete and bitumen to road base (where be removed site by bitumen practicable) demolition contractor to an approved facility Timber 20m3 Treated Timber - Re-use as Untreated Timber - Timber to be removed formwork, bridging, blocking Re-use as site by demolition and propping and send to floorboards, fencing, contractor to an second -hand timber furniture, mulch or approved facility suppliers send to second - hand timber suppliers. Plasterboard 5m3 Re-use for landscaping - Plasterboard to be (where practicable) removed site by demolition contractor to an approved facility Metals - please 50m3 Re-use or recycle (where - Removed from site by practicable) demolition contractor to an specify approved facility Asbestos 10m3 - - Licensed asbestos contractor to remove and take to an approved facility 4.0 Operational Waste Management Plan Once tenanted, an application will be made with Noosa Council for Commercial Waste Services, involving Refuse and Recycle Bulk Bins (1,100ltr low noise). The following table outlines the general mix of wastes expected to be generated, however depending on the mix of uses within convenience shopping centre and dwelling units, the estimated waste volumes may be subject to change. Treatment Reuse Recycle Disposal Typical Waste Estimated Stream Volume
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 2 pages
Page 2
Garbage generated unknown Collected and disposed - - Disposal by Council
in relevant bin area contractor
(total)
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Page 1 of 2
Paper unknown Collected and placed in - Yes -
recycling container on
site
Cardboard unknown Collected and placed in - Yes -
recycling container on
site
Glass unknown Collected and placed in - Yes -
recycling container on
site
Aluminium unknown Collected and placed in - Yes -
recycling container on
site
Steel Nil Collected and placed in - N/A -
recycling container on
site
Plastic containers unknown Collected and placed in - Yes -
recycling container on
site
Plastic wrap unknown Collected and disposed - Yes -
in bins on site.
Plastic unknown Collected and placed in - Yes -
recycling container on
components
site
Polystyrene unknown Collected and disposed - Yes -
in bins on site.
Foam unknown Collected and disposed - Yes -
in bins on site.
Rubber Nil Collected and disposed - Yes -
in bins on site.
Timber Nil Collected and disposed - Yes -
in bins on site.
Garden waste Nil N/A
Organic waste unknown Collected and disposed - Yes to Council -
in relevant bin area approved facility
(foodscraps)
Other Collected and disposed
in bins on site.
The tenants will be responsible for collection and disposal of refuse to the designated bin and recycling areas
located on the site plan. All bins are to be stored and located in the bin area.
The site manager is responsible for recycling and waste education with the objective of waste minimisation
and re-use of waste.
3.1 Waste Storage and Recycling Area
The waste storage and recycling areas are located within a screened and sealed enclosure. Access is
provided to the facility within Diamond Lane to accommodate a Medium Rigid Vehicle (MRV 12.5m template).
The roof form allows for sufficient clearance to allow for safe travel and lifting of bins.
The bin area will be constructed in accordance with Council Planning Scheme Policy 09 – Waste Management
and includes a bunded area (no more than 100mm in height) for bin washing, which is drained to the sewer.
The type of waste and storage required are:
a) bins for putrescible waste;
b) bins for recyclables;
c) drums for waste cooking oils;
d) bales for cardboard;
e) bags or bins for green waste; and
f) any other specialised waste storage bins needed, eg: medical waste;
Page 3
Sufficient space will be provided between waste storage bins to allow for manoeuvring and washing of bins,
where appropriate. Access to the bin enclosure is via the rear carparking area.
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Page 2 of 2