TOWN PLANNING CONSENT PERMIT - TPC 2500 Page4
14. The developer shall provide a metered water connection from the water supply
system to the proposed development, in accordance with Council's standards and to
the satisfaction of the Shire Engineer.
15. Roof and surface water is to be collected on site and is to be discharged through a
single underground drain line to Bryan Street to the satisfaction of the Shire
Engineer. A Building Approval shall not be granted until the Shire Engineer has
approved of the drainage scheme.
16. Provision of approved refuse containers in accordance with the requirements of the
Refuse Management Regulations of 1983 for the storage and collection of refuse to
the satisfaction of Council's Environmental Health Officer.
17. Any flat or unit intended to be let out for fee or reward is to be licensed annually
with Council's Health Department in accordance with the provisions of Chapter 43
of Council's By-Laws prior to such letting.
18. The swimming pool shall be licensed annually with the Council's Health Department
in accordance with the provisions of Chapter 42 of Council's By-Laws.
19. Submission of a cash bond or trading bank guarantee to the sum of $4000 to secure
performance of conditions, prior to the issue of Building Approval. The cash bond
or trading bank guarantee will be returned upon performance of the conditions of
approval.
20. The provisions of this approval are to be effected, prior to the commencement of the
approved use. Council reserves the right to call upon the bond or guaranteed sum
referred to in this approval for the purposes of litigation should the use not be
conducted in accordance with this approval.
21. The Town Planning Consent Permit may be revoked pursuant to Section 4.14 of the
Local Government (Planning and Environment) Act if commencement of erection
or works have not been made in accordance with that Permit or the rights conferred
by that Permit are not exercised within two (2) years of the date of issue of the
Permit.
The Town Planning Consent Permit lapses where:-
Document Set ID: 21970015
Version: 1, Version Date: 20/06/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
002 ECM_21970015_v1_TPC 2500 - Approval.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.