NOOSA COUNCIL IDAS Development Application Decision Notice

           13.1   . the use or erection of a building or other structure associated with the use, has not happened by
                    19 May 2009, unless application is made and approved by Council for an extension; or

           13.2. the use of the premises (extension to educational establishment) pursuant to the Development
                    Permit ceases.

Land Development
Carparking Off Street
14. The new carparking shall be provided within the site as shown on Dhamma Rasmi - Master Plan
    prepared by Bal Salrai LFRAIA Architect and referenced as Number 15 - Staff Carparking, except as
           modified herein.

15.        A minimum of 25 uncovered carpark spaces shall be provided on site, which shall include the existing 20
           spaces and the proposed new 5 spaces. The proposed new 5 spaces shall include 1 clearly defined
           disabled carpark space.

16.        The proposed new car parking area outside Reception Office shall be designed to comply with the
           provision of AS2890.1-2004 for user class 1 with allowance for vehicles to enter and leave the site in a
           forward gear.

17.        The proposed new car parking area outside the Reception Office shall be kept, maintained in a condition
           fit for use.

18. The new carparking area shall be free draining and the pavement constructed to a gravel access road
           standard. Plans and specifications for these works shall be submitted in conjunction with an application
           for a Development Permit for Operational Works.
 Pathways
 19.       Deleted.
Vegetation Protection
 20. Additional pavements within the drip zone of any of the existing trees on site to be retained shall be
           designed as a pervious pavement (such as grass paving cells or similar), as this will allow water that falls
           on this surface to penetrate to the trees root system. The pavement shall be constructed so as not to
           damage the tree or their root system and in this regard temporary fencing shall be provided around the
           trees during construction to help protect them.
            Plans shall be submitted to the Council for approval that clearly show the type and extent of the pervious
            pavement and the temporary fencing prior to obtaining a Development Permit for Operational Works.

 Stormwater Drainage
 21    .    All stormwater drainage shall be collected on site and discharged so there is no net increase in
            stormwater runoff from the site,

 22.        All site stormwater drainage from the additional structures shall be by means of a gravity system.

 23.        Roof runoff shall be directed to a rainwater storage system or tank (minimum storage '1 000 litres) that is
            plumbed to service the toilets and bathroom of each new cabin. The design of the rainwater storage
            system shall be to the satisfaction of the Manager Plumbing Services.

  24. To ensure that polluted run-off does not enter the tributary of Cooroora Creek, stormwater run-off from the
            new carparking area and any new driveways shall have the first flush (the first 12 mm of rainfall or hose-
            down) treated via a grassed swale or similar treatment system using Water Sensitive Urban Design
            principles,

 Effluent Disposal
  25.       Deleted.
  Earthworks
  26.        Filling works required on site shall be carried out in accordance with Section 3.8 of Council's Engineering
             Design Standards Manual and so as not to cause the ponding of water on any adjoining lands or the
             blockage of, or interference with, any natural watercourses.




  SE   P c :\dataw rks\te mp\1 222333\5633ndn. doc
Log in to download the original file

Attachment A Orginal approval and master plans.pdf · 4.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.