Original source · versioned page text
2022-08-18 Ordinary Meeting Minutes
The original of this document is very large (10.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING MINUTES 18 AUGUST 2022
b. where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval.
WASTE DISPOSAL
72. Prior to the issue of any Operational Works approvals the Operational Waste
Management Plan must be amended to reflect that all waste collection will be
undertaken by Council’s contractor via rear lift trucks with the trucks collecting 1100
litre bins.
73. The developer must provide waste storage and disposal facilities in accordance
with Planning Scheme Policy 9 - Waste Management. The facilities must include
an impervious area, within the site, correctly sized for all refuse and recycling
containers and suitably screened from public places and neighbouring properties.
A bin wash area is required with a cold-water tap, hose and drain outlet connected
to sewer, via a bucket trap. The drain outlet must be designed to prevent storm
water entry to the sewerage system.
74. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste
Management) Regulation 2000, for the storage and collection of refuse.
75. Storage, disposal and management of solid, liquid and vegetative waste is
conducted in a safe and ecologically sustainable manner without environmental
nuisance. In this regard, vegetated waste must be disposed of via a green waste
bin or at a local transfer station.
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
Carried unanimously.
2 BUDGET REVIEW 1 (BR1) FOR THE 2022/23 FINANCIAL YEAR
That Council note the report by the Manager Financial Services (Acting) to the General
Committee Meeting dated 15 August 2022 and approve the proposed changes to the budget
and schedule of fees and charges for the 2022/23 financial year as outlined in this report and
the Revised Budget Financial Statements attached to the report.
3 FINANCIAL PERFORMANCE REPORT – JULY 2022
That Council note the report by the Manager Financial Services (Acting) to the General
Committee Meeting dated 15 August 2022 outlining July 2022 year to date financial
performance against budget, including changes to the financial performance report with the
inclusion of key financial sustainability indicators.
Page 27 of 55
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.