ORDINARY MEETING MINUTES 18 AUGUST 2022
c. provision of rainwater tanks for the capture and reuse of roof water for the
irrigation of communal landscaping; and
d. accommodation for both severe storms or severe blockage of the
underground drainage network. A Severe Storm/Severe Blockage
Assessment for the drainage system proposed for the site is to be provided
with the development application for operational works, and is to
demonstrate that finished floor levels will not be inundated under either a
severe blockage of the underground drainage network in the 1%AEP event
at year 2100, or for a severe storm exceeding the 1%AEP based on design
blockage.
Acid Sulfate Soils
63. An Acid Sulfate Soil Management Plan must be prepared and submitted with the
Operational Works application for the site. The acid sulfate management plan
must include testing, monitoring and treatment requirements for the works.
Services
64. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits
and pipes to accommodate the future connection of optic fibre technology
telecommunications.
65. Certification must be submitted to Council from all relevant service providers
(Energex, NBN and Unitywater which certifies that the development has met the
requirements of this Decision Notice and all applicable legislation at the time of
construction.
Easements
66. Unless otherwise agreed in writing by the relevant service provider, any public or
third party infrastructure located on the subject site must be placed within an
easement registered against the title of the property.
67. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the Grantee’s
standard easement terms. Draft easement documentation must be submitted to
Council for endorsement.
68. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
69. All excavation, fill, soil retaining structures and associated batters must be
undertaken in accordance with an Operational Works approval, and contained
entirely within the subject site unless written permission from the respective
landowner(s) is provided to Council.
70. All retaining walls must be designed and constructed in accordance with the
planning scheme and must be certified by an RPEQ where exceeding 1.0m in
height. All retaining walls that are publicly accessible and exceed 1.0m in height
must be fitted with a commercial grade safety fence.
Damage to Services and Assets
71. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
Page 26 of 55
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.