Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2022-08-18 Ordinary Meeting Minutes

of 55

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

ORDINARY MEETING MINUTES   18 AUGUST 2022




                            Page 42 of 55

ORDINARY MEETING MINUTES                                                                     18 AUGUST 2022

     Corporate Plan Key   Operational Initiatives       Outcomes                   Responsible     Update                                         Status Q3     er.)
     Focus Areas                                                                   Areas/Officers
     through formal       Increase Community Grants | Improved community           Community       Completed — two grant rounds had and additional | Completed) Completed
     tenure               programme                      participation and social  Development/ | Alliance recipients.
     arrangements                                        benefits                  Community
                                                                                   Development
                                                                                   Manager
                          Sunshine Beach skate ramp | Improved design to better | Infrastructure   Awarded design and construct contract January | Ontrack   On track
                          renewal                        integrate skate facilities Planning Design) 2022, design reviews completed early April 2022
                                                        with surrounding           & Delivery,     and final design was received April 2022.
                                                         infrastructure and        Infrastructure | Construction forecast for August through to
                                                        environment                Planning        September 2022.
                                                                                   Design &
                                                                                   Delivery
                                                                                   Manager
                          Kin Kin Recreational Centre | Increased community       Property/        Building works complete.                       Completed| Completed
                          Renewal                       connection and responsible) Property
                                                         management of assets      Manager
                          Progress the implementation | Strategic direction for the | Community    Commenced implementation of                    Ontrack | Ontrack
                          of the Master Plans for the   development and            Development/ | recommendations.
                          Noosa District Sports          implementation of sport   Community       Concept design for redevelopment of Cooroy
                          Complex and Cooroy Sports | and recreation facilities    Development | Sports Complex.
                          Complex                                                  Manager         Resurfacing Noosa District Network courts.
                                                                                                   Undertaking feasibility study of Regen Wellbeing
                                                                                                   Hub.
     2.5 Plan and build | Continue with the             Completion by the end of | Infrastructure | Playground achieved practical completion 25   Ontrack | Completed
     an iconic all        construction of the           2021 to increase           Planning Design| March 2022, with minor landscaping impacts from
     abilities playground | Cooroy/Hinterland All-       interaction and           & Delivery/     February 2022 floods being managed.
     at Cooroy            Abilities Playground           inclusiveness             ya              Successful public opening on 13 April 2022 with a
                                                                                   Design &        formal opening on 6 May 2022.
                                                                                   Delivery
                                                                                   Manager
     2.6 Explore options | Pre-Feasibility Study Noosa | Options and scenarios for a) Director     Invitation to Quote finalized and contractor   On track   On track
     for and investigate  Regional Gallery (Stage 2)     new regional art gallery are} Community   selected. Inception meeting arranged.
     the feasibility of                                 analysed to assist Council | Services      Community consultation completed. Intent for
     relocating the                                      in deciding whether to                    final report in September/October.
     Noosa Regional                                      proceed to a further stage
    Gallery                                              in this project

                                                                                                Page 42 of 55
Log in to download the original file

2022-08-18 Ordinary Meeting Minutes(PDF, 10MB).pdf · 10.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.