ORDINARY MEETING MINUTES 18 AUGUST 2022
SK 201 Floor Plan – All Levels, prepared by Gerard Smith Design May 2022
Iss SK2
SK 401 Elevations – Sheet 1, prepared by Gerard Smith Design May 2022
Iss SK2
SK 501 Cross Sections – Sheet 1, prepared by Gerard Smith May 2022
Iss SK2 Design
SK 951 Overviewing Diagrams – Level 1, prepared by Gerard May 2022
Iss SK2 Smith Design
SK 952 Overviewing Diagrams – Level 2, prepared by Gerard May 2022
Iss SK2 Smith Design
3 Development authorised by this approval must be undertaken generally in
accordance with the Approved Plans listed within this Decision Notice.
Construction Management Plan & Pre-Start Meeting
4 A Construction Management Plan must be submitted to and approved by Council
prior to obtaining a building approval and must specifically address the following:
a. Traffic Management during all aspects of the construct phase including.
i. Traffic Management Control Plan in accordance with Manual of
Uniform Traffic Control Devices (MUTCD) detailing all temporary
signage and traffic control measures prior to construction.
ii. Maintenance of safe and unobstructed access across the frontage of
the site for pedestrians and vehicles both during daily construction and
after daily construction has ceased.
iii. Parking arrangements, number, and locations for vehicles associated
with the proposed construction works that need to be onsite or in
proximity to the site at any time during the phases of the construction
works. Where relevant, time slots and off-peak hours should be
indicated. All efforts must be made to prevent or minimise adverse
impact on public parking availability in the local area.
b. Works programme identifying key components of the works and their
respective durations.
c. Written confirmation from the Body Cooperate accepting the use of the
common property for activities associated with the construction works as
identified in the final Construction Management Plan and the Traffic
Management Plan.
d. Proposed fencing to the site during the construction phase of the
development.
e. Protection fencing for existing landscaping and trees in proximity to the work
activities.
f. Maintenance and protection of water quality and existing drainage lines
through the construction site through the implementation of appropriate
erosion and sediment control measures to prevent silt and contaminants from
entering existing stormwater system.
g. Establishment of a communication protocol with the general public, adjoining
owners, emergency services and local businesses to advise of agreed
construction times, impacts on traffic and services and other relevant issues.
Page 9 of 55
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.