Original source · versioned page text
Negotiated Approved Plans - MCU26/0040, OPW26/0066 & RAL26/0013 (As Published)
Original PDF page 10, section 1. The text section number identifies this passage in the reader.
B
20
TRIMDEK ROOF SHEETING
TRIMDEK ROOF SHEETING
TRIMDEK ROOF SHEETING
@ MIN 2o PITCH
@ MIN 2o PITCH
@ MIN 2o PITCH
FALL
FALL
FALL
TRIMDEK ROOF SHEETING
TRIMDEK ROOF SHEETING
TRIMDEK ROOF SHEETING
@ MIN 2o PITCH
@ MIN 2o PITCH
@ MIN 2o PITCH
FALL
FALL
FALL
B NORTH
20 MATERIAL CHANGE OF USE FOR LOW IMPACT INDUSTRY AND
ANCILLARY TRANSPORT DEPOT (CONTRACTORS DEPOT)
01 FLOOR PLAN - BUILDING B REMI RAFTER
- LEVEL 3 Scale @ A3 1:200 LOT 18 TAYLOR COURT
J1 26.09.28 Elevations on sheet 25 amended ST DJ COOROY
J 26.08.31 DA Revision ST DJ
i 26.05.29 DA Revised civil Issue C inserted ST DJ
ST DJ
NOOSA COUNCIL H
G
26.05.26
18.05.26
Revised civil Issue C inserted
Revised Area schedule ST DJ ST DJ
ST DJ
APPROVED PLAN F 14.05.26 Concrete panel to caretakers
As Indicated 03.12.25
NOTE:- E
D
14.05.26
14.05.26
Preliminary WD Buildings A & B for coordination ST
RFI response with Civil Rev B added ST
DJ
DJ
2025-68
END OF TRIP FACILITIES TO BE PROVIDED IN EACH TENANCY MCU26/0040, OPW26/0066 & RAL26/0013 C 01.05.26 Revised stages & bin locations ST DJ 10
B 30.04.26 550mm setback to Bldg D Tenancies 37 - 47 ST DJ
1 OCTOBER 2026 A 27.02.26 Preliminary DA Issue ST DJ DA DRAWINGS J1
GSPublisherVersion 676.0.97.0
ROOF PLAN - BUIDING B _ LEVEL 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.