Original source · versioned page text
Negotiated Approved Plans - MCU26/0040, OPW26/0066 & RAL26/0013 (As Published)
Original PDF page 11, section 1. The text section number identifies this passage in the reader.
C
21
UP UP UP UP UP UP UP
1 1 1 1 1 1 1
2 2 2 2 2 2 2
3 3 3 3 3 3 3
4 4 4 4 4 4 4
5 5 5 5 5 5 5
6 6 6 6 6 6 6
7 7 7 7 7 7 7
8 8 8 8 8 8 8
9 9 9 9 9 9 9
10 10 10 10 10 10 10
11 11 11 11 11 11 11
12 12 12 12 12 12 12
13 13 13 13 13 13 13
14 14 14 14 14 14 14
15 15 15 15 15 15 15
16 16 16 16 16 16 16
17 17 17 17 17 17 17
18 18 18 18 18 18 18
TENANCY 30 TENANCY 29 TENANCY 28 TENANCY 27 TENANCY 26 TENANCY 25 TENANCY 24
REF REF REF REF REF REF REF
SHW VAN VAN SHW SHW VAN VAN SHW SHW VAN VAN SHW SHW VAN
MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ.
60 m2 MV MV 60 m2 60 m2 MV MV 60 m2 60 m2 MV MV 60 m2 60 m2 MV
SCREEN SCREEN
SCREEN SCREEN
SCREEN SCREEN
SCREEN SCREEN
SCREEN SCREEN
SCREEN SCREEN
SCREEN SCREEN
SF SF SF SF SF SF SF
920
920
920
920
920
920
920
WC WC WC WC WC WC WC
920
920
920
920
920
920
920
WC WC WC WC WC WC WC
SF SF SF SF SF SF SF
MV MV MV MV MV MV MV
SHW VAN VAN SHW SHW VAN VAN SHW SHW VAN VAN SHW SHW VAN
50mm SETDOWN
TO AMENITY SLAB
REF REF REF REF REF REF REF
MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ.
60 m2 60 m2 60 m2 60 m2 60 m2 60 m2 60 m2
18 18 18 18 18 18 18
17 17 17 17 17 17 17
16 16 16 16 16 16 16
15 15 15 15 15 15 15
14 14 14 14 14 14 14
13 13 13 13 13 13 13
12 12 12 12 12 12 12
11 11 11 11 11 11 11
TENANCY 17 10
9
8
10
9
8
TENANCY 18 TENANCY 19 10
9
8
10
9
8
TENANCY 20 TENANCY 21 10
9
8
10
9
8
TENANCY 22 TENANCY 23 10
9
8
7 7 7 7 7 7 7
6 6 6 6 6 6 6
5 5 5 5 5 5 5
4 4 4 4 4 4 4
3 3 3 3 3 3 3
2 2 2 2 2 2 2
1 1 1 1 1 1 1
UP UP UP UP UP UP UP
C NORTH
21 MATERIAL CHANGE OF USE FOR LOW IMPACT INDUSTRY AND
ANCILLARY TRANSPORT DEPOT (CONTRACTORS DEPOT)
01 FLOOR PLAN - BUILDING C REMI RAFTER
- LEVEL 1 Scale @ A3 1:200 LOT 18 TAYLOR COURT
J1 26.09.28 Elevations on sheet 25 amended ST DJ COOROY
J 26.08.31 DA Revision ST DJ
i 26.05.29 DA Revised civil Issue C inserted ST DJ
NOOSA COUNCIL H
G
26.05.26
18.05.26
Revised civil Issue C inserted
Revised Area schedule
ST
ST
DJ
DJ ST DJ
APPROVED PLAN F 14.05.26 Concrete panel to caretakers ST DJ
As Indicated 03.12.25
NOTE:- E
D
14.05.26
14.05.26
Preliminary WD Buildings A & B for coordination ST
RFI response with Civil Rev B added ST
DJ
DJ
2025-68
END OF TRIP FACILITIES TO BE PROVIDED IN EACH TENANCY MCU26/0040, OPW26/0066 & RAL26/0013 C 01.05.26 Revised stages & bin locations ST DJ 11
B 30.04.26 550mm setback to Bldg D Tenancies 37 - 47 ST DJ
1 OCTOBER 2026 A 27.02.26 Preliminary DA Issue ST DJ DA DRAWINGS J1
GSPublisherVersion 676.0.97.0
FLOOR PLAN - BUIDING C _ LEVEL 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.