Negotiated Approved Plans - MCU26/0040, OPW26/0066 & RAL26/0013 (As Published)
Original PDF page 12, section 1. The text section number identifies this passage in the reader.
C
21
TENANCY 30 TENANCY 29 TENANCY 28 TENANCY 27 TENANCY 26 TENANCY 25 TENANCY 24
MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ.
60 m2 60 m2 60 m2 60 m2 60 m2 60 m2 60 m2
MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ.
60 m2 60 m2 60 m2 60 m2 60 m2 60 m2 60 m2
TENANCY 17 TENANCY 18 TENANCY 19 TENANCY 20 TENANCY 21 TENANCY 22 TENANCY 23
C NORTH
21 MATERIAL CHANGE OF USE FOR LOW IMPACT INDUSTRY AND
ANCILLARY TRANSPORT DEPOT (CONTRACTORS DEPOT)
01 FLOOR PLAN - BUILDING C REMI RAFTER
- LEVEL 2 Scale @ A3 1:200 LOT 18 TAYLOR COURT
J1 26.09.28 Elevations on sheet 25 amended ST DJ COOROY
J 26.08.31 DA Revision ST DJ
i 26.05.29 DA Revised civil Issue C inserted ST DJ
NOOSA COUNCIL H
G
26.05.26
18.05.26
Revised civil Issue C inserted
Revised Area schedule
ST
ST
DJ
DJ ST DJ
APPROVED PLAN F 14.05.26 Concrete panel to caretakers ST DJ
As Indicated 03.12.25
NOTE:- E
D
14.05.26
14.05.26
Preliminary WD Buildings A & B for coordination ST
RFI response with Civil Rev B added ST
DJ
DJ
2025-68
END OF TRIP FACILITIES TO BE PROVIDED IN EACH TENANCY MCU26/0040, OPW26/0066 & RAL26/0013 C 01.05.26 Revised stages & bin locations ST DJ 12
B 30.04.26 550mm setback to Bldg D Tenancies 37 - 47 ST DJ
1 OCTOBER 2026 A 27.02.26 Preliminary DA Issue ST DJ DA DRAWINGS J1
GSPublisherVersion 676.0.97.0
FLOOR PLAN - BUIDING C _ LEVEL 2
See the original