Negotiated Approved Plans - MCU26/0040, OPW26/0066 & RAL26/0013 (As Published)
Original PDF page 17, section 1. The text section number identifies this passage in the reader.
D
21
TENANCY TENANCY TENANCY TENANCY TENANCY TENANCY TENANCY
49 50 51 52 53 54 55
MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ.
47 m2 47 m2 47 m2 47 m2 47 m2 47 m2 50 m2 51 m2
D
21
01 FLOOR PLAN - BUILDING D
- LEVEL 3 - PART 03 Scale @ A3 1:200
NOTE:-
END OF TRIP FACILITIES TO BE PROVIDED IN EACH TENANCY
BUILDING D
PART 03
BUILDING B BUILDING C
STAGE LEGEND
STAGE 1 BOUNDARY
STAGE 2 BOUNDARY
STAGE 3 BOUNDARY
STAGE 4 BOUNDARY
BUILDING A STAGE 5 BOUNDARY
NORTH
MATERIAL CHANGE OF USE FOR LOW IMPACT INDUSTRY AND
ANCILLARY TRANSPORT DEPOT (CONTRACTORS DEPOT)
REMI RAFTER
LOT 18 TAYLOR COURT
J1 26.09.28 Elevations on sheet 25 amended ST DJ COOROY
J 26.08.31 DA Revision ST DJ
i 26.05.29 DA Revised civil Issue C inserted ST DJ
H 26.05.26 Revised civil Issue C inserted ST DJ
NOOSA COUNCIL G 18.05.26 Revised Area schedule ST DJ ST DJ
02 KEY PLAN
ST DJ
APPROVED PLAN F
E
14.05.26
14.05.26
Concrete panel to caretakers
Preliminary WD Buildings A & B for coordination ST DJ As Indicated 03.12.25
MCU26/0040, OPW26/0066 & RAL26/0013 - LEVEL 1 Scale @ A3 1:2500
D
C
14.05.26
01.05.26
RFI response with Civil Rev B added
Revised stages & bin locations
ST
ST
DJ
DJ 2025-68 17
B 30.04.26 550mm setback to Bldg D Tenancies 37 - 47 ST DJ
1 OCTOBER 2026 A 27.02.26 Preliminary DA Issue ST DJ DA DRAWINGS J1
GSPublisherVersion 676.0.97.0
FLOOR PLAN - BUIDING D _ LEVEL 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.