Original source · versioned page text
Negotiated Approved Plans - MCU26/0040, OPW26/0066 & RAL26/0013 (As Published)
Original PDF page 18, section 1. The text section number identifies this passage in the reader.
TRIMDEK ROOF SHEETING
TRIMDEK ROOF SHEETING
TRIMDEK ROOF SHEETING
@ MIN 2o PITCH
@ MIN 2o PITCH
@ MIN 2o PITCH
FALL
FALL
FALL
01 ROOF PLAN - BUILDING D
- LEVEL 1 - PART 01 Scale @ A3 1:200
TRIMDEK ROOF SHEETING
TRIMDEK ROOF SHEETING
TRIMDEK ROOF SHEETING
@ MIN 2o PITCH
@ MIN 2o PITCH
@ MIN 2o PITCH
FALL
FALL
FALL
02 ROOF PLAN - BUILDING D BUILDING D
- LEVEL 2 - PART 02 Scale @ A3 1:200 STAGE LEGEND
PART 01 PART 02
STAGE 1 BOUNDARY
STAGE 2 BOUNDARY
STAGE 3 BOUNDARY
STAGE 4 BOUNDARY
BUILDING B BUILDING C STAGE 5 BOUNDARY
NORTH
MATERIAL CHANGE OF USE FOR LOW IMPACT INDUSTRY AND
NOTE:- ANCILLARY TRANSPORT DEPOT (CONTRACTORS DEPOT)
END OF TRIP FACILITIES TO BE PROVIDED IN EACH TENANCY
REMI RAFTER
BUILDING A
LOT 18 TAYLOR COURT
J1 26.09.28 Elevations on sheet 25 amended ST DJ COOROY
J 26.08.31 DA Revision ST DJ
i 26.05.29 DA Revised civil Issue C inserted ST DJ
H 26.05.26 Revised civil Issue C inserted ST DJ
NOOSA COUNCIL G 18.05.26 Revised Area schedule ST DJ ST DJ
ST DJ
APPROVED PLAN F 14.05.26 Concrete panel to caretakers
As Indicated 03.12.25
MCU26/0040, OPW26/0066 & RAL26/0013
03 KEY PLAN E
D
14.05.26
14.05.26
Preliminary WD Buildings A & B for coordination ST
RFI response with Civil Rev B added ST
ST
DJ
DJ
DJ 2025-68 18
- LEVEL 1 Scale @ A3 1:2500 C 01.05.26 Revised stages & bin locations
B 30.04.26 550mm setback to Bldg D Tenancies 37 - 47 ST DJ
1 OCTOBER 2026 A 27.02.26 Preliminary DA Issue ST DJ DA DRAWINGS J1
GSPublisherVersion 676.0.97.0
FLOOR PLAN - BUIDING D _ LEVEL 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.