Negotiated Approved Plans - MCU26/0040, OPW26/0066 & RAL26/0013 (As Published)
Original PDF page 19, section 1. The text section number identifies this passage in the reader.
D
21
TRIMDEK ROOF SHEETING
TRIMDEK ROOF SHEETING
TRIMDEK ROOF SHEETING
@ MIN 2o PITCH
@ MIN 2o PITCH
@ MIN 2o PITCH
FALL
FALL
FALL
D
21
01 ROOF PLAN - BUILDING D
- LEVEL 3 - PART 03 Scale @ A3 1:200
NOTE:-
END OF TRIP FACILITIES TO BE PROVIDED IN EACH TENANCY
BUILDING D STAGE LEGEND
PART 03
STAGE 1 BOUNDARY
STAGE 2 BOUNDARY
STAGE 3 BOUNDARY
STAGE 4 BOUNDARY
BUILDING B BUILDING C STAGE 5 BOUNDARY
NORTH
MATERIAL CHANGE OF USE FOR LOW IMPACT INDUSTRY AND
ANCILLARY TRANSPORT DEPOT (CONTRACTORS DEPOT)
REMI RAFTER
BUILDING A
LOT 18 TAYLOR COURT
J1 26.09.28 Elevations on sheet 25 amended ST DJ COOROY
J 26.08.31 DA Revision ST DJ
NOOSA COUNCIL 02 KEY PLAN i
H
G
26.05.29
26.05.26
18.05.26
DA Revised civil Issue C inserted
Revised civil Issue C inserted
Revised Area schedule
ST
ST
ST
DJ
DJ
DJ ST DJ
- LEVEL 1 Scale @ A3 1:2500 ST DJ
APPROVED PLAN F
E
14.05.26
14.05.26
Concrete panel to caretakers
Preliminary WD Buildings A & B for coordination ST DJ As Indicated 03.12.25
MCU26/0040, OPW26/0066 & RAL26/0013 D
C
14.05.26
01.05.26
RFI response with Civil Rev B added
Revised stages & bin locations
ST
ST
DJ
DJ 2025-68 19
B 30.04.26 550mm setback to Bldg D Tenancies 37 - 47 ST DJ
1 OCTOBER 2026 A 27.02.26 Preliminary DA Issue ST DJ DA DRAWINGS J1
GSPublisherVersion 676.0.97.0
FLOOR PLAN - BUIDING D _ LEVEL 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.