Original source · versioned page text
Negotiated Approved Plans - MCU26/0040, OPW26/0066 & RAL26/0013 (As Published)
Original PDF page 5, section 1. The text section number identifies this passage in the reader.
NOTE:-
END OF TRIP FACILITIES TO BE PROVIDED IN EACH TENANCY
BUILDING D
BUILDING B BUILDING C
UP UP UP UP UP UP UP UP
PART 01
BUILDING A PART 02
1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3
4 4 4 4 4 4 4 4
5 5 5 5 5 5 5 5
6 6 6 6 6 6 6 6
7 7 7 7 7 7 7 7
TENANCY 9 TENANCY 8 TENANCY 7 TENANCY 6 TENANCY 5
8 8 8 8 8 8 8 8
9 9 9 9 9 9 9 9
TENANCY 10
11
10
11 TENANCY 10
11
10
11
10
11
10
11
10
11
10
11
11 10
12 12 12 12 12 12 12 12
13 13 13 13 13 13 13 13
14 14 14 14 14 14 14 14
15 15 15 15 15 15 15 15
16 16 16 16 16 16 16 16
17 17 17 17 17 17 17 17
18 18 18 18 18 18 18 18
MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ.
47 m2 47 m2 55 m2 55 m2 55 m2 55 m2 55 m2
REF REF REF REF REF REF REF REF
03 KEY PLAN
VAN VAN VAN VAN VAN VAN VAN VAN - LEVEL 1 Scale @ A3 1:2500
SHW SHW SHW SHW SHW SHW SHW SHW
MV MV MV MV MV MV MV MV
SCREEN
SCREEN
SCREEN
SCREEN
SCREEN
SCREEN
SCREEN
SF SF SF SF SF SF SF SF
920
920
920
920
920
920
920
WC WC WC WC WC WC WC WC
STAGE LEGEND
STAGE 1 BOUNDARY
STAGE 2 BOUNDARY
01 FLOOR PLAN - BUILDING A
STAGE 3 BOUNDARY
STAGE 4 BOUNDARY
NORTH
- LEVEL 1 - PART 01 Scale @ A3 1:200 STAGE 5 BOUNDARY
A
20
BALCONY
UP OVER 18 m2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
UP UP UP UP
1 1 1 1
2 2 2 2
3 3 3 3
J1 26.09.28 Elevations on sheet 25 amended ST DJ
4 4 4 4
5 5 5 5
J 26.08.31 DA Revision ST DJ
6 6 6 6
7 7 7 7
TENANCY 5 TENANCY 4 TENANCY 3 TENANCY 2 TENANCY 1 i 26.05.29 DA Revised civil Issue C inserted ST DJ
8 8 8 8
9 9 9 9
10
11
10
11
10
11
10
11 H 26.05.26 Revised civil Issue C inserted ST DJ
12 12 12 12
G 18.05.26 Revised Area schedule ST DJ
13
14
13
14
13
14
13
14 MEZZANINE F 14.05.26 Concrete panel to caretakers ST DJ
15
16
15
16
15
16
15
16
OVER 65 m2 E 14.05.26 Preliminary WD Buildings A & B for coordination ST DJ
D 14.05.26 RFI response with Civil Rev B added ST DJ
17 17 17 17
18 18 18 18
C 01.05.26 Revised stages & bin locations ST DJ
MEZZ. MEZZ. MEZZ. MEZZ. B 30.04.26 550mm setback to Bldg D Tenancies 37 - 47 ST DJ
55 m2 55 m2 63 m2 63 m2 A 27.02.26 Preliminary DA Issue ST DJ
REF REF REF REF REF
REMI RAFTER
SHW VAN VAN SHW SHW VAN VAN SHW SHW VAN
LOT 18 TAYLOR COURT
MV MV MV MV MV COOROY
NOOSA COUNCIL
SCREEN
SCREEN
SCREEN
SCREEN
SCREEN
SF SF SF SF SF
BICYCLE
920
920
920
920
920
WC WC WC WC WC
STORE
APPROVED PLAN
50mm SETDOWN
TO AMENITY SLAB
A
MCU26/0040, OPW26/0066 & RAL26/0013 FLOOR PLAN - BUIDING A _ LEVEL 1
20 1 OCTOBER 2026 ST DJ
02 FLOOR PLAN - BUILDING A As Indicated 03.12.25
Scale @ A3 1:200 2025-68
- LEVEL 1 - PART 02 MATERIAL CHANGE OF USE FOR LOW IMPACT INDUSTRY AND 05
ANCILLARY TRANSPORT DEPOT (CONTRACTORS DEPOT) DA DRAWINGS J1
GSPublisherVersion 676.0.97.0
See the original
The page text is free to read. Viewing or downloading an original file needs an account.