Negotiated Approved Plans - MCU26/0040, OPW26/0066 & RAL26/0013 (As Published)
Original PDF page 6, section 1. The text section number identifies this passage in the reader.
NOTE:-
END OF TRIP FACILITIES TO BE PROVIDED IN EACH TENANCY
BUILDING D
BUILDING B BUILDING C
BUILDING A
PART 01 PART 02
TENANCY TENANCY 10 TENANCY 8 TENANCY 6
11 TENANCY 9 TENANCY 7 TENANCY 5
MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ.
47 m2 47 m2 55 m2 55 m2 55 m2 55 m2 55 m2
03 KEY PLAN
- LEVEL 1 Scale @ A3 1:2500
STAGE LEGEND
STAGE 1 BOUNDARY
STAGE 2 BOUNDARY
01 FLOOR PLAN - BUILDING A
STAGE 3 BOUNDARY
STAGE 4 BOUNDARY
NORTH
- LEVEL 2 - PART 01 Scale @ A3 1:200 STAGE 5 BOUNDARY
A
20
BALCONY
18 m2
J1 26.09.28 Elevations on sheet 25 amended ST DJ
J 26.08.31 DA Revision ST DJ
TENANCY 5 TENANCY 4 TENANCY 3 TENANCY 2 TENANCY 1 i 26.05.29 DA Revised civil Issue C inserted ST DJ
H 26.05.26 Revised civil Issue C inserted ST DJ
MEZZANINE G 18.05.26 Revised Area schedule ST DJ
65 m2 F 14.05.26 Concrete panel to caretakers ST DJ
E 14.05.26 Preliminary WD Buildings A & B for coordination ST DJ
D 14.05.26 RFI response with Civil Rev B added ST DJ
C 01.05.26 Revised stages & bin locations ST DJ
B 30.04.26 550mm setback to Bldg D Tenancies 37 - 47 ST DJ
A 27.02.26 Preliminary DA Issue ST DJ
MEZZ. MEZZ. MEZZ. MEZZ.
55 m2 55 m2 63 m2 63 m2
REMI RAFTER
LOT 18 TAYLOR COURT
COOROY
NOOSA COUNCIL
APPROVED PLAN
A
MCU26/0040, OPW26/0066 & RAL26/0013 FLOOR PLAN - BUIDING A _ LEVEL 2
20 1 OCTOBER 2026 ST DJ
02 FLOOR PLAN - BUILDING A As Indicated 03.12.25
- LEVEL 2 - PART 02 Scale @ A3 1:200
MATERIAL CHANGE OF USE FOR LOW IMPACT INDUSTRY AND 2025-68 06
ANCILLARY TRANSPORT DEPOT (CONTRACTORS DEPOT) DA DRAWINGS J1
GSPublisherVersion 676.0.97.0