Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Engineering Roads Report (Traffic)

of 38

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

  Noosa Fair and Bowls Club Redevelopment

© 2013 - TTM Consulting Pty Ltd                                                       Reference No: 12SCT0068



                    Thursday Car Parking Demand (Shared
                                  Parking)
  600

  500

  400

  300

  200

  100

    0
         7:00 8:00 9:00 10:00 11:00 12:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00 8:00 9:00
         AM AM AM AM AM PM PM PM PM PM PM PM PM PM PM

Figure 4.3: Parking Demand Profile for Noosa Fair Redevelopment – Stage 2

The result of this parking demand analysis is that the redevelopment should provide 507 spaces
with Stage 1 and 567 spaces with Stage 2.


4.5        Proposed Parking Supply and Adequacy

4.5.1      Stage 1
The proposed redevelopment will provide a total of 617 parking spaces. This includes the removal
of 21 parking spaces along the northern side of the shopping centre car park. This parking supply
is approximately 2% less than the parking requirements in the Noosa Plan. This parking supply,
however, is greater than parking rates in the draft SCPS, surveys and parking demand analysis
implies.
The proposed parking supply is considered suitable as it exceeds the anticipated parking demands
generated by all uses.


4.5.2      Stage 2
The proposed redevelopment will provide a total of 622 parking spaces. This includes the removal
of 79 spaces and reinstatement of 84 spaces in the commercial and residential lots. This parking
supply is less than the parking requirements in the Noosa Plan (15%), and the draft SCPS (5%).
This parking supply, however, is generally in accordance with surveyed parking demands and
greater than shared parking demand analysis implies (10%). TTM note construction related
activity is not expected to significantly impact on parking availability.
The proposed parking supply is considered suitable as it exceeds the anticipated parking demands
generated by all uses.


www.ttmgroup.com.au
                                  T: (07) 5479 2455 F: (07) 5479 3651 E: [email protected]        Page 13
Log in to download the original file

Engineering Roads Report (Traffic).pdf · 1.8 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.