  Noosa Fair and Bowls Club Redevelopment

© 2013 - TTM Consulting Pty Ltd                                                          Reference No: 12SCT0068


7.3        Analysis of Cooyar Street / Lanyana Way Intersection
Table 7.3 gives a summary of the outputs for the various traffic cases applied to the intersection.

Table 7.3: Summary of Sidra Outputs – Cooyar Street / Lanyana Way

                                                                             th
 Case                             Highest        Highest /     Worst      95 Percentile Critical Queue (m)
                                  Degree of      Average       Level
                                  Saturation     Delay         of         South      East        North    West
                                                               Service
                                                 (secs)

 2012 Thursday PM Current         33.6%          12.0 / 8.6    B          12.8       -           7.1      8.1
 Case

 2016 Thursday PM Base            38.8%          12.1 / 8.7    B          15.5       -           8.4      9.7
 Case

 2016 Thursday PM Project         44.2%          12.2 / 9.1    B          18.8       -           10.7     11.9
 Case

 2026 Thursday PM Base            57.0%          12.6 / 9.6    B          31.5       -           13.4     16.2
 Case

 2026 Thursday PM Project         64.0%          12.6 / 10.2   B          41.1       -           16.4     19.3
 Case

 2012 Saturday Current Case       39.5%          11.8 / 8.6    B          16.0       -           6.3      6.2

 2016 Saturday Base Case          45.6%          11.9 / 8.7    B          19.8       -           7.5      7.4

 2016 Saturday Project Case       51.6%          12.1 / 9.1    B          24.4       -           9.6      9.4

 2026 Saturday Base Case          66.1%          12.3 / 9.8    B          44.3       -           11.7     11.9

 2026 Saturday Project Case       73.7%          12.6 / 10.6   B          59.7       -           14.6     14.6


7.4        Pinaroo Way Assessment
The schematic masterplan report for the Noosa Junction Placemaking Strategy area identifies that
Pinaroo Way should incorporate several key characteristics. These aspects are reviewed and
assessed in Table 7.4. The EW (east west) section relates to the Noosa Fair frontage and the NS
(north south) section relates to the Pinaroo Rotary Park frontage.




www.ttmgroup.com.au
                                  T: (07) 5479 2455 F: (07) 5479 3651 E: [email protected]           Page 24
Log in to download the original file

Engineering Roads Report (Traffic).pdf · 1.8 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.