Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Engineering Roads Report (Traffic)

of 38

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

  Noosa Fair and Bowls Club Redevelopment

© 2013 - TTM Consulting Pty Ltd                                                        Reference No: 12SCT0068


2.3        Access
The existing two accesses from Lanyana Way will be retained under existing approvals. Two 7m
wide accesses will connect commercial, residential, retail and tavern uses to Pinaroo Way. A new
access to Lanyana Way will provide exit only from these uses and will mainly cater for service
vehicles.


2.4        Parking
The development proposal includes car parking provision identified in Table 2.2, with other
parking provisions shown in Table 2.3.

Table 2.2: Car Parking Provision

 Parking space type / location         Stage 1                               Stage 2

 Existing Noosa Fair Shopping          365 (incl. 6 PWD bays)                365 (incl. 6 PWD bays)
 Centre

 General spaces in redeveloped         205 (incl. 3 PWD bays)                126 (incl. 3 PWD bays)
 part of site

 Pinaroo Way on-street parking         47 (incl. 3 PWD bays)                 47 (incl. 3 PWD bays)
 spaces

 Commercial spaces                     -                                     45 (incl. 2 PWD bays)

 MUD spaces                            -                                     39 (incl. 2 PWD bays)

 Total                                 617 (incl. 12 PWD bays)               622 (incl. 16 PWD bays)

Table 2.3: Other Parking Provision

 Parking space type / location         Stage 1                               Stage 2

 M/C spaces                            42                                    39


 Bicycle spaces                        45                                    69




www.ttmgroup.com.au
                                  T: (07) 5479 2455 F: (07) 5479 3651 E: [email protected]          Page 4
Log in to download the original file

Engineering Roads Report (Traffic).pdf · 1.8 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.