Original source · versioned page text
Appendix H. Planning Scheme Code Responses
Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works Economic Report & PScheme Code Response - MCU17/0572 & OPW17/0611.
INFRASTRUCTURE USES CODE
Performance Criteria and Acceptable Solutions
PROBABLE SOLUTIONS COUNCIL USE
SPECIFIC OUTCOMES SOLUTIONS* COMMENTS
(IF CODE ASSESSABLE) ONLY
O5 Infrastructure Uses are secure and S5.1 For Installations and Towers—the casual surveillance. The development is secure and
potential impacts from vandalism are use is fenced with security fencing; potential impacts from vandalism are minimised as far
minimised. as it is practical.
S5.2 For other Infrastructure Uses—no Complies with specific outcomes
probable solution
Artificial lighting The proposed lighting associated with the use will be
O6 The generation of spill light by S6.1 Lighting associated with the use is designed, installed, operated and maintained in
development, which gives rise to designed, installed, operated and accordance with Section 3 of AS4282 The Control of the
annoyance, discomfort, distraction or a maintained in accordance with Section 3 of Obtrusive Effects of Outdoor Lighting.
reduction in the ability to see essential AS4282 The Control of the Obtrusive
information, is avoided. Effects of Outdoor Lighting.
Mechanical plant and equipment Complies with probable solutions
O7 Mechanical plant and equipment S7.1 Plant and equipment are— The plant equipment is located more than 2m from any
(including air conditioning equipment) (a) located more than 2m from any property boundary and is screened by sufficient
are— property boundary; and landscaping.
(a) positioned to minimise adverse (b) screened by dense vegetation or
impacts on the amenity of any fencing (i.e. 1.5m wide vegetated
residential premises; buffer area);
(b) designed and positioned to visually S7.2 Plant and equipment are located Complies with probable solutions
integrate with the building and roof within a building. The storage area is concealed inside the building. The
design; and loading area is screened by landscaping and 1.8m high
(c) appropriately screened. fencing.
1 Solution: = Acceptable Solution Appendix H
A/S = Alternative Solution
N/A = Not applicable to this proposal
PR137996-1 Commenced 3 February 2006 – Amended 3 March 2008 Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.