Council archive · source document
RFI - Appendix 5 - Water Managment Plan · MCU19/0117
Plans and drawings: the text below has words only, no drawings.
1.0 Introduction and Background Tod Consulting has been engaged by Mark Bain Constructions to provide engineering advice on a proposed wave pool at 90 Beach Road North Shore. The purpose of this report is to outline the strategies proposed to manage the operational water level in the proposed wave pool. The proposed pool will cover an approximate area of 4,000m2, and will vary from 0.0 to 1.5m in depth. The pool will be contained within walls approximately 2.0m high above normal water levels in order to retain the design wave heights. The operational tolerance for the water level within the pool is +/- 100mm 2.0 Maintaining water levels in the pool As noted above the operational tolerance for the wave pool is +/- 100mm. In order to maintain the water level in the pool within this operational range it will be necessary to top the water level up during prolonged dry periods and dispose of excess water during prolonged wet periods. Using Bureau of Meteorology data on rainfall and evaporation rates we have calculated the necessary disposal volume for the 95th percentile wettest day and month during any one year and likewise determined the required top up volume based on 5th percentile driest month. This information is tabulated in Appendix A & B. In summary (after operational tolerances are allowed for): • The worst month for the 95th percentile wettest month (March) results in a disposal volume of 1,448,000 Litres. • The worst case of the 95th percentile wettest day results in a disposal volume of 840,000 Litres. The worst case scenario for the 5th percentile lowest rainfall month (January) (95% driest) results in a demand volume for top up of 160,000 Litres, however the cumulative effect of consecutive dry months (Oct-Feb) comes to 329,600 litres. Geotechnical investigations and testing have revealed that the existing ground conditions for the site consist mainly of sands with a hydraulic infiltration rate of 1.5m per day (62.5mm/hr). As such it is proposed to install one or more water tanks with natural ground base to dispose of any surplus pool water via ground infiltration. The water from the pool will pass through a dosing process to neutralise any chlorine or salt treatment used for the pool water prior to it being placed into the water tank for infiltration into the ground. Based on our analysis we believe that a single tank 12m in diameter and 2.5m high (capacity of 280,000 litres) will be enough to maintain the water levels at operational levels for all but a few days of the year during the 95th percentile wettest conditions. Should the pool operator wish to reduce the number of “down days” then a second tank could to provided. Note the average infiltration volume for a 12m diameter tank equates to 169,000 litres/day. To cater for the driest periods, again a single tank of a similar size (with a sealed base) will be enough to cater for the majority of the 5th percentile driest months. However as noted above should cumulative dry months occur consecutively then there is a risk that the water level in the pool could drop below the operational level for an extended period (more than one month). As such a second tank may be considered necessary. As noted in the introduction the pool will have 2m high sides to retain the proposed wave, as such up to 2m of rainfall can occur without the pool over topping. This represents almost an entire year of rainfall for the 90th percentile wettest conditions. As such and based on the proposed disposal method for excess water noted above the disposal of excess water can be easily managed without the need for any emergency overflow weir. Page 2 of 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Appendix 5 - Water Managment Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 233 KB (small file)
- File type
No other editions are linked here.