3.0 Conclusions and Recommendations
As noted above we have demonstrated that the water levels in the wave pool can be successfully
and simply managed using two 280,000 litre water tanks, one with an unsealed base for disposal
of excess water via infiltration and one for storage for top up during dry periods. This may still result
in some “down” days where the water level in the pool exceeds the operational tolerance level, so
there is an option to double the number of tanks to reduce (or virtually eliminate) any “down” days.
Doug Reynolds, Director – Civil Group
PREQ 9072
07 5449 9600 | [email protected]
TOD consulting engineers
Page 3 of 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Appendix 5 - Water Managment Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 233 KB (small file)
- File type
No other editions are linked here.