GENERAL COMMITTEE MEETING 18 JUNE 2018
area is required with a cold-water tap, hose and drain outlet connected to sewer,
via a bucket trap. The drain outlet must be designed to prevent storm water entry
to the sewerage system. This can be achieved with a nib wall 50mm high and up
to 700mm x 700mm wide (max 0.5m²), or alternatively the waste area can be
roofed, or any other design approved by Council.
14. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste
Management) Regulation 2000, for the storage and collection of refuse.
15. Public bins must be provided to reduce littering. All bins provided must be for
refuse and recycling and be decanted into the bulk bins by the site operators.
ENGINEERING
Site Access and Driveways
16. Sealed access driveways must be maintained from Main Street to all parking and
manoeuvring areas of the development.
Car Parking
17. A minimum of 5 car parking spaces must be provided and marked on the site and
made available and accessible at all times while the use is open for business.
The carparking must include in particular:
a. provision of vandal resistant public lighting with intensities to satisfy the
requirements of Australian Standard AS1158: Public Lighting Code
b. 1 disabled parking space/s within the total
c. dimensions, crossfalls and gradients in accordance with the relevant
Australian Standard (AS/NZS2890.1:2004 for staff and customers,
AS/NZS2890.6:2009 for people with disabilities).
18. All car parking areas and access driveways must be maintained exclusively for
vehicle parking and manoeuvring and kept in a tidy and safe condition at all times.
Stormwater Drainage
19. Stormwater runoff from the development must be disposed of on-site without
causing scour or damage to the subject site or any adjoining property.
Earthworks and Retaining Walls
20. All earthworks and associated batters must be contained entirely within the
subject site unless written permission from the respective landowner(s) is
provided to Council. All earthworks must be undertaken in accordance with the
provisions of Australian Standard AS3798: Guidelines on Earthworks for
Commercial and Residential Developments.
Damage to Services and Assets
21. Any damage caused to existing services and assets as a result of the
development works must be repaired at no cost to the asset owner at the
following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Page 8 of 9