Council archive · source document
08/1698 - Preliminary Building Appoval [As Published] · 172008.1698
bd Suc ibe beam to |
painted timber post as sched. post,
‘Stirrup and footing all to eng. det,
stone tle on mortar bed as sched.
On conc. slab to eng. det:
a /\
painted fc render as sched. Painted timber rafters to
wall plate on concealed galv. eng. det.
ci fabs fr rater fixing to eng. det. 40 sq. nom. powdercoated - H
alum. battens as sched. Ih
I
fascia gutter as sched.
roof sheeting as sched. on
timber battens and rafters to
eng. det. insulation as sched.
painted render as sched. with
flashing
Ay
Arccorer RL 6.050
(oe
2
painted VJ soffit lining as sched.
on hangers as required
1:100 fat
beet ean stacting sliding painted timber trim bead all round SB is5:3
" A Bh Sl Pawited iimber cover batten Painted, square set
Plasterboard reveal, packed
/c3\ asreqd
concealed mutti-stacking: framing fixed to conc. siab
sliding track to AWS’ det. and beam as req'd to
‘Support roof pergola and
Support roof! pergola and bottom roller multi-stacking,
bottom roller multi-stacking, sliding doors
Sliding doors
AWS multi 1: AWS multi-stacking,
sliding doors as sched. painted timber post as sched. post, Sliding doors as sched.
és floor grate as sched. stirrup and footing all to eng, det. /\ sis floor grate as sched.
Stone file on mortar bed as sched. stone tile on mortar bed as sched, Stone tile on mortar bed as sched.
On cone. slab to eng. det. FFL 2.800 on conc. slab to eng. det.
ow
Oman
L\ ZT] L\
SCALE1:20 @ A2
rebated and plugged fixings
painted timber post as sched. post,
Stirrup and footing al to eng. det.
Stone tie on mortar bed as sched.
On conc. slab to eng. det-
fixing plate to eng. detais
painted timber bead all ‘round
A RL 5.230 /\
Y NE
painted, square set
concealed multi-stacking
4: framing fixed to conc, slab
sliding track to AWS’ det. and beam es read te
Support roof/ pergola and
bottom roller mutti-stacking,
sliding doors
AWS multi-stacking,
Sliding doors as sched.
s/s floor grate as sched.
Stone tile on mortar bed as sched.
fall On conc. slab to eng. det.
Painted FC fascia including
between rafters as sched.
sted t
painted timber post as sched. post,
Stirrup and footing all to eng. det.
stone tile on mortar bed as sched. r>
kidd
+CO
designers
20 Duke Street
Sunshine Beach QLD 4567
PO Box 262
Noosa Heads QLD 4567
$e
Telephone 07 5447 5633
Facsimile 07 5447 5833
[email protected]
www. kiddco.com.au
C3 Revised Pergola Issued for B.A 03.09.08
C2 Revised eng & pool ayout 09.05.08
C1 Issued for constructionicient revisions
10.03.08
72 Issued for Building Approval 26.11.07
71 Issued for tender 16.11.07
Project
PROPOSED
RESIDENCE
Location
30 NOOSA PARADE
NOOSA HEADS
Client
TAYLOR
Drawing Tide
PERGOLA DETAILS
Scale Date
as shown Mar.'07
Drawn By dob No:
LFAEW 0705
Drawing No. issue No.
WD.704 (c3)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1698 - Preliminary Building Appoval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.