Council archive · source document
08/1698 - Preliminary Building Appoval [As Published] · 172008.1698
INTEG!
RATED PLANNING ACT 1997 Part £, Version 3.0, 3 September 2007
Table B
(i) What is the nature of the operational work?
(1 Roadworks {1 Stormwater (1 Water infrastructure (1) Sewerage infrastructure
(1 Landscaping (1) Clearing vegetation under the planning scheme (4 Earthworks
{1 Drainage works ([] Signage [1 Other - Scecity tefow
(ii) Is the application for operational work involving the creation of new lots?
(0 No
(1 Yes - Specify sumber below
(iii) What type of approval is being sought?
(1 Development Permit C1 Preliminary Approvat
(iv) ts there a current Preliminary Approval for this operational work on the premises?
OO No
(Cs Yes - Complete Table 8(a}
Table B{a)
pee
[ 4.
(v) Are the works subsequent to a previous Development Permit or Preliminary Approval for another aspect of development?
OO No
(1 Yes - Complete Table 3b)
Table 8{b)
ieee
LIEANOTHERSE
ge
ement:
Confirmed
OFFI
ICE USE ONLY
ater
ray
Advice for completing Part E
General advice
+ Part A must also be completed for all IDAS develooment acolicaticns.
+ All questions must be answered unless. following a response, there is 2 statement tc go directly to a particular question.
Qta2
develocment io occur.
-2-
A develcoment permit authorises development io occur. while a oreliminary 2ocrcval is a steo in the acoroval orccess and does not authcrise
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1698 - Preliminary Building Appoval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.