Stormwater Technical Memo · MCU23/0096
Queensland Head Office: Level 4, 196 Wharf Street, Spring Hill Qld 4000 PO Box 1344, Buddina Qld 4575 Main: +61 7 3532 1300 colliers.com .au TECHNICAL MEMO TO: Doug Reynolds, TOD Consulting FROM: Kelly McKendry, Colliers Engineering and Design SUBJECT: Good Shepherd: Art Centre Stormwater Analysis DATE: 24 April 2023 OUR REFERENCE: 21-0211TM-SW01-V3 1 INTRODUCTION Colliers Engineering and Design (Colliers) has been commissioned by TOD Consulting Engineers to undertake a preliminary stormwater assessment to support a Development Application (DA) for an extension of the Arts Centre at Good Shepherd Lutheran College (real property description: Lot 1 on SP228052). 2 PROPOSED WORKS The proposed Arts Centre forms part of a school-wide renovation. The Masterplan is shown in Figure 1. The focus of this assessment is Building 1, highlighted below. Technical Memo | 21-0211TM-SW01-v3 |Good Shepherd Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 4 pages
Page 2
Arts Centre Figure 1. Masterplan for Good Shepherd. Arts Centre is Building no. 1. 3 ASSESSMENT METHOD To quantify the extent of changes between the existing and proposed development, the Masterplan layout was transposed over a Nearmap image. Figure 2 highlights the approximate extent of the Arts Centre upgrade. A surface-split comparison has been estimated based on this overlay and a shown in Table 1. Technical Memo | 21-0211TM-SW01-v3 |Good Shepherd Page 2
Page 3
Figure 2. Extent of Proposed Arts Centre (right) transposed on existing (left). Table 1. Estimated Surface-Split Breakdown. Note: the garden and green corridor attached to the proposed building are included in the area calculations. Surface-Split Existing Proposed Roof Area (m2) 0 1,200 Road/Pathway (m2) 1,200 0 Garden/Open Space (m2) 0 165 Total (m2) 1,200 1,365 4 HYDROLOGIC ANALYSIS In accordance with the Queensland Urban Drainage Manual, peak stormwater flows are calculated based on impervious fractions. As shown in Table 2, the impervious fraction between the existing and proposed areas do not significantly change. This indicates that there will not be any significant changes to peak flows, and as such, detention is not required. Table 2. Impervious Fraction Estimate. Hydrological Assessment Existing Proposed Impervious Area (m2) 1,200 1,200 Impervious Fraction (%) 88 88 Technical Memo | 21-0211TM-SW01-v3 |Good Shepherd Page 3
Page 4
5 WATER QUALITY ANALYSIS
Stormwater quality modelling is based on split surface areas and their associated export pollutant
load. As per Table 1, above, the roof area increases by approximately 1,200 m2, while the road
area decreases by approximately 1,200m2. In accordance with MUSIC Modelling Guidelines, roof
pollutant export values are significantly less than road pollutant export parameters (see Table 3). As
such, it could be expected that stormwater pollutant loads would decrease with the proposed
developed. Therefore, no additional stormwater quality improvement devices are required.
Table 3. Pollutant Export Parameters.
Pollutant Export Parameters for Split Catchment Land-use (Log10 values)
Land Split Flow Type TSS TP TN
Use Mean Std. Dev Mean Std. Dev Mean Std. Dev
Roof Baseflow N/A N/A N/A N/A N/A N/A
Stormflow 1.3 0.38 -0.89 0.34 0.37 0.34
Commercial
Roads Baseflow 0.78 0.39 -0.6 0.5 0.32 0.3
Stormflow 2.43 0.38 -0.3 0.34 0.37 0.34
Ground Baseflow 0.78 0.39 -0.6 0.5 0.32 0.3
Stormflow 2.16 0.38 -0.39 0.34 0.37 0.34
Source: Table 3.9 (MUSIC Modelling Guidelines).
6 CONCLUSION
As there have been no significant changes to the overall impervious area associated with the
proposed Arts Centre, it has been determined that no additional detention or stormwater quality
improvement devices are required. This advice is based on the current Masterplan layout (Burling
Brown’s drawing: GSL05-SK-02, Dated 24/2/23) and aligns with QUDM (2017) and MUSIC Modelling
Guidelines (2018) requirements, and Noosa Shire Council requirements.
If Council require further explanation of the above or additional information, please contact the
undersigned at [email protected] DISCLAIMER
This report is prepared by Colliers for exclusive use by its client only. No responsibility is accepted for
the use of or reliance upon this report in whole or in part by any third party.
The sole purpose of this report and the associated services performed by Colliers is to display
information in accordance with the scope of services set out in the contract/quotation between
Colliers and its client. The scope of works and services were defined by the requests of the client,
by the time and budgetary constraints imposed by the client, and by the availability of access to
site/s and information.
This report is prepared with information supplied by the client and possibly others which is presumed
to be accurate and complete. No responsibility is accepted for information that is withheld,
incorrect or that is inaccurate, nor for changes to the conditions over the passage of time or from
latent circumstance or conditions. No warranty or guarantee is made in relation to the data,
findings and conclusions expressed in this report.
Technical Memo | 21-0211TM-SW01-v3 |Good Shepherd Page 4
Page 5
This report has been compiled at the level of detail specified in the report and no responsibility is accepted for interpretations made at more detailed levels than so indicated. Yours faithfully Colliers Engineering and Design Kelly McKendry Director – Water & Environment RPEQ 09298 Technical Memo | 21-0211TM-SW01-v3 |Good Shepherd Page 5
Used in these records
Stormwater Technical Memo.pdfRelated documentApplication case desk ↗
About this file
- File size
- 517 KB (small file)
- File type
No other editions are linked here.