Council archive · source document
Stormwater Technical Memo · MCU23/0096
Arts Centre Figure 1. Masterplan for Good Shepherd. Arts Centre is Building no. 1. 3 ASSESSMENT METHOD To quantify the extent of changes between the existing and proposed development, the Masterplan layout was transposed over a Nearmap image. Figure 2 highlights the approximate extent of the Arts Centre upgrade. A surface-split comparison has been estimated based on this overlay and a shown in Table 1. Technical Memo | 21-0211TM-SW01-v3 |Good Shepherd Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Technical Memo.pdfRelated documentApplication case desk ↗
About this file
- File size
- 517 KB (small file)
- File type
No other editions are linked here.