Original source · versioned page text
20210153 - Maple Street SWMP
Original PDF page 15, section 1. The text section number identifies this passage in the reader.
Figure 4.2 - Rainfall run-off parameters for SEQ
As the existing site is largely unchanged, only the proposed additions to the site have been
modelled The source nodes have been created using a split catchment approach with the
proposed new roof and driveway areas separated and modelled with stochastic pollutant
generation for each of the surface types as per Table 4.1 - Residential Split Node Pollutant
Generation Parameters. The area and impervious fractions for each catchment are actual values
based on the design plans.
Table 4.1 - Residential Split Node Pollutant Generation Parameters
Flow Type Surface TSS LOG¹º TP LOG¹º VALUES TN LOG¹º VALUES
Type Mean St. Dev Mean St. Dev Mean St. Dev
Baseflow Roof N/A N/A N/A N/A N/A N/A
Driveway 1.00 0.34 -0.97 0.31 0.20 0.20
Ground 1.00 0.34 -0.97 0.31 0.20 0.20
Stormflow Roof 1.30 0.39 -0.89 0.31 0.26 0.23
Driveway 2.43 0.39 -0.30 0.31 0.26 0.23
Ground 2.18 0.39 -0.47 0.31 0.26 0.23
The proposed treatment train has been modelled as shown in Figure 4.3 - MUSIC Stormwater
Treatment Train. The details of the treatments are described in the following sections
Project number 20210153
File RECOR Preliminary Stormwater Management Report - 20210153.docx, 2022-03-31 Page 15 of 26
Revision 0
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (20210153 - Maple Street SWMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.