Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

20210153 - Maple Street SWMP

of 67

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 16, section 1. The text section number identifies this passage in the reader.

                                   Figure 4.3 - MUSIC Stormwater Treatment Train




                    4.2.1.1.             Detention Tank
The detention tank has been modelled as a rainwater tank where the overflow is considered the low
flow outlet and no reuse or storage volume is modelled. The OSD has been conceptually modelled
as two 25kL tanks with a single 55mm orifice plate as the low flow outlet however the final OSD tank
arrangement will be confirmed with Op Works approval.




Project number 20210153
File RECOR Preliminary Stormwater Management Report - 20210153.docx, 2022-03-31                                 Page 16 of 26
Revision 0

P +61 7 5211 1003                A 37 Mary St, Noosaville Qld 4566                E [email protected]   recorconsulting.com

Log in to download the original (20210153 - Maple Street SWMP.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.