Original source · versioned page text
20210153 - Maple Street SWMP
Original PDF page 4, section 1. The text section number identifies this passage in the reader.
INTRODUCTION RECOR has been engaged to prepare a Stormwater Management Report to accompany a development application for a Residential Development consisting of 11 units for NDIS accommodation. This report investigates the stormwater management considerations for the existing and proposed development site and assesses how the run-off from the site is to be managed in accordance with Noosa Shire Council requirements for stormwater drainage. Project number 20210153 File RECOR Preliminary Stormwater Management Report - 20210153.docx, 2022-03-31 Page 4 of 26 Revision 0 P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (20210153 - Maple Street SWMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.