 SITE DETAILS

     2.1. Existing Site Description
The existing site is made up of 4 Lots: Lot 15 C 5605, Lot 1 RP 99323, and Lot 2 RP 99323 with frontage
to Maple Street, and Lot 18 C 5605 fronting Myall Street. The existing site contains two dwellings and
two sheds and the lots cover a combined area of 3,118m². This area is to be reconfigured into two
new lots, consisting of a lot containing the existing dwelling on Maple Street, which is to be retained,
and the remaining lot which is proposed for the development. Refer to the Town Planning report for
details of this reconfiguration.

The subject land falls typically east towards Myall Street at grades varying across the site. Towards
the eastern frontage, the site slopes at approximately 10%. To the south-west of the site fronting
Maple Street, the ground slopes at between 4% to 6%, while the north-western corner of the site has
typically level grades of around 1%.


     2.2. Existing Drainage Patterns
The run-off from the site is expected to typically drain as overland surface flows towards the east of
the site. Within Lot 15 C 5605, Lot 1 RP 99323, and Lot 2 RP 99323 a small channel was observed
which appears to convey roof run-off from a downpipe of the existing building towards a dilapidated
drainage line falling towards Maple Street however the outlet into the kerb and gutter system
appeared blocked with dirt.

Two existing field pits were identified in the survey on Lot 18 C 560, and several stormwater outlet
points were observed to discharge from the retaining wall on the property boundary with Myall
Street. Roof run-off from the building is carried by downpipes which are believed to discharge via
the observed outlets in the retaining wall.
The surface run-off will drain towards the east into Myall Street, where a downstream kerb inlet pit is
the nearest stormwater infrastructure and likely point of collection for the existing run-off.




Project number 20210153
File RECOR Preliminary Stormwater Management Report - 20210153.docx, 2022-03-31                                 Page 5 of 26
Revision 0

P +61 7 5211 1003                A 37 Mary St, Noosaville Qld 4566                E [email protected]   recorconsulting.com

Log in to download the original (20210153 - Maple Street SWMP.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.