Council archive · source document
Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208
Very large file (86.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Benchmarked goals, aims and objectives included:
The socio-economic development of the Noosa Region;
Incorporation of sustainable, non-polluting energy systems;
Retention proposals of significant areas of vegetation and waterbodies;
Active measures to mitigate impacts and improve areas for the biodiversity of native
animal species, local flora and fauna through reforestation and propagation of native
species;
Access to organic and natural food supplies (local markets and shops);
Rainwater harvesting and ground water recharging techniques;
Creation of stormwater retention ponds and the reuse of roof stormwater;
The protection and enhancement of the site’s natural attributes, its character and its
open spaces by the implementation of soil erosion prevention methods;
The minimising of impacts through good planning and design that would otherwise
place pressure on the environment within and surrounding the site.
The proceeding influences and benefits reflected in the Concept Master Plan and
other supporting documentation, which shows:
Permanent residential tenure mix offering a spectrum of styles and affordability;
Services that are consistent with the needs of residents and accommodated visitors;
Interpretive, educative and management functions that build on the site’s location
and setting;
Commitment to adopting best practice environmental management techniques;
Integration with landform and landscape, respecting and responding to its location
and setting;
Commitment to the creation of a community that reflects the uniqueness of the
location and its environment.
Precinct location and siting planning
The site has benefited from the following:
A sensitive utilisation of the site as a sustainable and unique residential and tourist
orientated inland lake side village style development with a potential ’Live Change’
focus;
A low density but comprehensive development using life cycle financial modeling that
reflects a distinct regional and local stakeholder perspective;
Development substitution made between existing use approval and new ’mixed-use’
precinct establishing a more appropriate environmental, social and economic capital
outcome on an underutilized part ’brownfield’ site with an environmental
enhancement of the existing landscaping and infrastructure;
A documented strategy of sustainable environmental design for all new buildings and
i nfrastructu re.
9
EC3 (Earthcheck)Prec nct Plann ng and Des gn Standard (PPDS)for Prec ncts. Cert cat on Report
@ 2007 EC3 Asia Pacific. All rights reserved. Version EC3 PPOS 2012.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 86.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.