Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208

of 127

Text shows just the words. Original shows the document exactly as it was published.

Very large file (86.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Evaluation of the            precinct’s location and resultant master plan zoning clearly
indicates the potential of positive impacts on native habitat and biodiversity_ This is
due to the following:

         An    extremely low total impermeable site coverage through a building development
         footprint area of only 19% (this figure is likely to be much lower i.e. approximately
         12% if soft landscaping areas of lot gardensfyards are added);

         Re-establishment of previous landscape character through the regenerative cultivation
         of existing (and planting of new) native plant species;

         A    major high value conservation land                  use    strategy involving approximately 230
         hectares of ecologically valuable land;

         A wildlife habitat and species particularly Koala protection strategy with environmental

         and    wildlife    buffers    and    movement          zones    to   be   established; (See also Social
         Commitment)

         An extensive       planting programme throughout all landscaped and open spaces of the
         proposed precinct;

         Implementation of considerable               non     building   zones     within the    precinct making the
         provision of open space areas in excess of statutory obligations;

         A   ecologically sensitive flora and fauna resources protection philosophy and strategy
         to be employed at the development:

         A treeplanting strategy involving native species trees to mitigate carbon emissions
         from residentialhousing provision aimed at creating a carbon neutral residential
         development;

         A proactive strategy to mitigate heat island effects to be implemented;

         The use of an ’optimisation of prime location views’ strategy implemented;

         A    minimal      disturbance       strategy     to    the     topography     and      natural   environment

         implemented and to be sustained during the development construction;

         The use of minimum lot sizes with                a    range of building covenants to ensure          designs
         not exceeding a maximum site coverage of approximately 50% of the building lot to

         encourage bio diversity opportunities through extensive natural yard                       provision;

         Good public transport links to the development;

         Proposed ’own precinct’ shuttle bus service for the retirement and age care precincts,
         and the opportunities for the use              battery driven vehicles (i.e. golf buggy) within the
         precinct through       a   CTS system of roads and pathways;

         Vehicle speed restrictions within areas of the precincts roadway infrastructure;

         Low     impact recreational           programmes         and    activities    strategies for ecologically
         sensitive areas;


Energy Efficiency and Conservation
In   ensuring that the principle for sustainable energy design      is achieved the precinct has
committed       to   a   ’whole of    systems’ view when designing systems for reducing energy
consumption particularly during the post construction or operational phase. The project will


                                                                                                                   10
EC3 (Earthcheck)Prec nct Plann ng and Des gn Standard (PPDS)for Prec ncts. Cert cat on Report
@ 2007 EC3 Asia Pacific. All rights reserved. Version EC3 PPOS 2012.

Used in these records

About this file

File size
86.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 22 of 37 Appendix 20 - Earthcheck MCU12_0208.pdf · 86.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.