Council archive · source document
Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208
Very large file (86.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Specific targets set for reductions in the water supplied or consumed in
commercial, retail and open space buildings and areas as follows:
A target of 75% savings in irrigation water consumption using drip irrigation for
recreational areas, open spaces and infrastructure landscaped areas;
A target of 30% savings in town water consumption using water conserving wes,
urinals, faucets, showers etc. throughout the precinct;
Imposed design measures on fixtures and fittings specifications i.e. the use of Eco
Labels.
Solid and Other Waste Management
Waste minimisation and management principles will be adopted through implementation of a
’Waste Management Plan’ as part of future building and landscape works approvals to reduce
the generation of waste and to limit waste disposal to landfill. Reductions in the amount of
solid waste generated by the precinct’s building function through implementing on-site waste
compaction are proposed. Further it is noted that the development’s location has determined
that benefits can be derived from certain planning and design approaches and decisions.
The Client-Developer has taken good advantage of this fact by the following noted
strategies, recommendations and proposals:
A minimum of on site cut and fill to balance these works so that there is no transport
impact on adjoining residents from the potential of fill importation, and as this site
has good quality topsoil the entire good quality soil quantity will be saved for soil
cultivation;
A solid waste management strategy is to be developed for future works approvals
which adheres to principles of reduce, recycle and reuse;
The segregation of waste into categories at all points of origin with on site sorting to
be employed in the operational phase;
Minimizing of packaging to be encouraged i.e. reusable containers, bulk packing, etc;
The use of ’Vermicompost’and mulching of organic waste;
Major proposed regarding
initiatives waste management and reduction during the
total construction phase;
. Waste generation reduction targets for post occupancy to be set for the commercial
and retail buildings along with the implementation of monitoring of land fill use;
Strategies for prefabrication and standardization to be considered during design
phase.
Resource Conservation (Materials)
There is clear evidence of attempts to reduce consumption of natural resources and mitigate
impacts on ecosystem biodiversity by mitigation. The opportunities taken are reflected in the
use of the site location and conditions. Further construction and operation proposals driven
by the dedicated sustainability documents for the precincts infrastructure and buildings
should reduce the quantities of new materials used and incorporate the use of reclaimed,
recycled and other green materials where possible.
13
EC3 (Earthcheck)Prec nct Plann ng and Des gn Standard (PPDS)for Prec ncts. Cert cat on Report
@ 2007 EC3 Asia Pacific. All rights reserved. Version EC3 PPOS 2012.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 86.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.