Council archive · source document
Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208
Very large file (86.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Pets Numbers and types of domestic animals will be controlled
under the requirements of the precincts Community Title
Scheme. All marketing material and individual strata titles will
clearly indicate that domestic animals will be controlled by the
CTS particularly breeds predisposed to hunting.
Pests Insects Buildings will be sealed and caulked and points of entry will be
protected by adequate mechanical means from insect and
pest entry.
Properly fitting door seals will be provided on all exterior and
exposed hallway doors.
Implementation of an environmentally sensitive program
regarding mosquito and insect control.
Landform Cut and Fill Excavations and cut and fill operations are limited to the
minimum practicable with natural landforms being preserved
or reinstated to the greatest degree practicable whilst
Flooding and ensuring minimal impact occurs to the local community.
Drainage
Improvements to the existing flooding classification of the site
with no reduction in the flood storage capacity of the site,
whilst also improving the flood free access & egress for the
adjoining community.
Water Conservation and Roof water will be captured and directed to rainwater tanks
impervious areas for re-supply into precinct non potable water systems.
Rainwater tank overflow in storm events will be directed to
gravel infiltration trenches and dams and then infiltrated into
the groundwater system via discharge onto the proposed
future landscaping and environmental restoration areas.
No impervious areas will connect directly to the drainage
system. All such areas will be drained via:
Rainwater tanks;
Grassed bio-retention swales, buffer strips and basins;
Porous driveways;
Gravel infiltration trenches; or Infiltration basins and
dams.
Gravel infiltration trenches and dams will fully contain the
’first flush’ from all car parks and driveways.
All drainage paths will be vegetated.
Water Quality Construction works to be guided by a comprehensive soil and
water management plan.
Discharge of storm water from the precinct will not exceed the
following ’pre-development’ criteria and in fact the developer
proposes that the project will improve the quality of
stormwater runoff.
4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 86.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.