Ground Water Ground water will not be extracted or used for any purpose.
Sewage Treatment No sewage will be stored, treated or disposed of on-site to
and Disposal ensure that the adjoining environmental zones are protected.
All sewage will be piped via a new rising main to be
constructed and linked to the existing Noosa sewage
treatment plant facilities.
Potable Water Potable water will be obtained from an improved existing town
supply main, however the proposed 100% capture and reuse
of roof stormwater will reduce town supplied potable water
use by 25 to 30%.
Water Reticulation The water reticulation system for the precinct will include both
a potable town water system and a separate system for the
reticulation of reclaimed water from the:
-
100% capture and reuse of all roof water.
Appliances Only the highest star rated appliances that are commercially
available (preferably 5 star) will be installed.
Only low flow (91/min)shower heads and aerating taps will be
installed.
AAA rated water fixtures to be used throughout the resort
hotel and promoted in all precinct dwellings.
Hot Water Throughout the precinct all public buildings and facilities will
have gas fired or solar HWS systems. Owner occupiers will be
encouraged to also use energy efficient gas fired or solar HWS
systems in their property designs.
Toilet Flushing Encouragement for the use of rainwater tanks (boosted by
town water if required) will be used for toilet flushing.
Only dual Flush 6/31 toilets will be installed in public buildings
and facilities.
Landscape Irrigation systems will be water efficient drip type with
Irrigation automatic timers and rain/soil moisture sensor shut offs.
Town water will NOT be used for irrigation.
Reclaimed stormwater from the Integrated Water Cycling
Management system will be used.
Construction All Buildings Lightweight, prefabricated, modular building techniques will
be used wherever practicable to minimise site disturbance.
Works Construction works will be guided by a comprehensive soil
and water management plan.
5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 86.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.