The developer is committed to the goal of using world class planning and design practices at
Noosa on Weyba, with the responsibility of delivery falling on the planning and design
development team. They are charged with delivering an innovative mixed use precinct with a
wide range of stakeholders. This precinct is to be environmentally, socially and economically
sustainable. The challenge is site specific given the precincts unique location and geography. To
achieve the goals, aims and objectives noted it is important that there is total integration of the
practical dimensions of planning and design delivery. However equally important is the need for
commitment from all members of the development team to the principles of sustainability.
To achieve this: the Development Champion (See Figure 6) will be required to start the
process of commitment by completing sections of the following guidelines and checklists. This
presentation of directives and requirements will amend over time during the phases of total
development. This early whole system review is an indication of awareness by the developer
regarding the need for integration and appropriate decision taking at the critical planning and
design phase.
1. COMMITMENTS (After Hanover Principlesi1
Precinct Sustainability at Noosa on Weyba Queensland
Commitment to ’Sustainability Principles’
V’
1 To provide a healthy, supportive, diverse and sustainable built environment
for the built and natural environment
2 To adopt a broad, interactive and interdependent planning and design
approach to the Master Planning of the precinct.
3 To use ’triple bottom line’ philosophy regarding planning and design inputs
and outcomes
4 To determine responsibility for and consequences of planning and design
decisions.
5 To ensure long term safety, low maintenance and added value throughout
the precinct and adjoining area.
6 To eliminate waste by using ’life cycle’ approaches when planning and
designing all aspects of the precincts products and processes.
7 To utilize energy sources that are from ’green’ sources and sustainable in
the longer term.
8 To seek to ensure the long term evolution of the precinct in a positive and
sustainable manner.
9 To provide an open and sharing planning and design process that is both
ethical and integrative of all stakeholders.
10 To seek constant improvements through knowledge transfer throughout the
planning and design process.
2. ACTIONS (AfterAIAi2
Precinct Sustainability at Noosa on Weyba Queensland
Commitment to Action Sustainability Principles
../
1 Ensure environmental, social and economic sustainability are at the core of
the precincts qoals aims and objectives.
2 Adopt sustainable planning and design practices, procedures and standards
in deliverinq the Master Plan.
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 86.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.