Council archive · source document
Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208
Very large file (86.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
3 Create wide educational value in the integration of sustainable planning and
design at the precinct.
4 Undertake a planning and design approach which is aimed at meeting and
changing statutory regulatory requirements regarding sustainable outcomes.
5 Deliver performance outcomes that improve the new and existing built
environment at and surroundinq the precinct.
The developer has determined that the planning and design of the precinct must give
consideration to ecological sustainability through a range of broad strategies and principles and
practical planning and design inputs. These include at the practical level orientation, energy
efficiency, water conservation and management, waste and resources management. For the
broader precinct development level connectivity to adjoining economic and social infrastructure
is considered critical. However whilst reference is made in the following guidelines and
checklists the majority of the equally important broad and practical social and economic inputs
are to be found in an accompanying document entitled quality of life guidelines.
Noosa on Weyba is a mixed use precinct with a range of residential dwellings and tenure and
community facilities. There are also extensive open spaces. All of these are to be supported by
infrastructure and services. The scale of the development allows for a variety of neighborhoods
to be created within the boundaries of the precinct. Accordingly the following guidelines and
checklists have been created to accommodate in the first instance a broad range of
sustainability opportunities. These will encompass the whole of the precinct and attempt to
determine an aggregated balance for the undertaking. The second suite of documents will
consider individual areas and buildings. This approach it is suggested will provide a means to
achieve wider sustainable outcomes.
Regarding the benchmarking and certification it is essential for there to be full and concise
descriptions of the development, its location, proposals and participations if the process is to
work efficiently and economically. Of critical importance is single point contact. These details
and other relevant facts should be identified in a project profile or executive summary or by
using a ’Pre Commitment Questionnaire’ that is required for all developments seeking to
undertake PPDS benchmarking and certification. This document’s questions which are
reproduced here seek to determine a developers project aims, goals and scope with respect to
sustainability. As this is normally requested at the feasibility stage of a project it is also a
means by which a developer can begin to foster a policy for an inclusive planning approach,
which prioritizes sustainability, and increases the probability that sustainable outcomes are
achieved in the project. In addition, its use is a way to begin the process of establishing
planning targets with a performance basis for master planning, ensuring possible reductions in
greenhouse gas emissions and other key areas such as waste and water use.
3. PRE COMMITMENT AND ACTIONS ASSESSMENT
Pre commitment assessment of development (planning, design and infrastructure construction)
against The EC3 Global (Earthcheck) Precinct Planning and Design Standard (PPDS):
(PPDS)KEY AREAS YES / NO RESPONSIBILITY COMMENTS
1: Sustainable planning, design and infrastructure construction approach
Will the Planning Report and Master
Plan contain a sustainability vision
and appropriate aims and
objectives?
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 86.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.