Council archive · source document
Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208
Very large file (86.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
S. PRECINCT PLANNING AND DESIGN STARTEGIES
At Noosa on Weyba opportunity to achieve a wide range of sustainable outcomes arises from
the fact that the Developer: Northbrook has significant control over strategic planning and
design decisions. This ability to direct and ultimately determine the course of the development
delivery in terms of sustainability should not be underestimated. How to use this control
effectively is crucial and should be aimed at supporting the planning and design team in either
encompassing third party criteria and/or generating their own measures. Underpinning these
measures is what Buchanan (2005)terms the ’Ten Shades of Green,13:
Low Energy/ High Performance;
Replenisable sources;
Recycling: Eliminating Waste and Pollution;
Embodied Energy;
Long Life Loose Fit;
Total Life Cycle Costing;
Embedded in Place;
Access and Urban Context;
Health and Happiness;
Community and Connectivity.
The outcomes from using these shades in the implementation of a broader strategic approach
will it is believed lead to a development that has the following attribute;
A secure and
well-designed precinct with distinctive human scale environments
(neighborhoods)combined with the best features of a unique, rural hillside location and
topology;
Improved pre planning and design, construction and post occupancy management
processes which encourage, implement and support sustainable practices;
Empowered stakeholders able to influence decisions which impact on the quality of life
of themselves and others.
Precinct Sustainability at Noosa on Weyba Queensland
14
Key Precinct Planning and Design Management Strategies (after TCPA)
./ or x Comments
1 Encou rage the active involvement of the Precincts
existing and new stakeholders in the development
process.
2 Ensure that the precinct development and any related
(i.e.
activity offsite playing fields, long term
management) includes a sustainability principles
statement in its brief.
3 Apply the sustainability principles to the
same
assessment of all applications made to the Precinct
for approval to carry out any planning, design and
construction related activity.
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 86.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.