Council archive · source document
Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208
Very large file (86.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
4 Enforce sustainable on-site processes dealing with
crucial issue such as waste management, energy
usage, construction activity etc.
5 Make decisions that are carbon neutral where
practical and seek to reduce impacts that may lead to
climate change.
6 All planning and design decisions taken must ensure
that appropriate reuse of the land within the Precinct
particularly regarding densities.
7 Encourage the concept of zero energy or net export
energythrough energy efficiency, embedded energy
generation and energy efficient supply systems
throughout the precinct.
S Where practical implement plans for the conservation
of materials and the promotion of locally sourced,
recycled or sustainably managed resources.
9 Ensure the conservation of water both internally and
externally of the precinct.
10 Determine and implement planning and design,
construction and post occupancy management
processes that ensure reductions in the impacts of
noise, flooding and micro-climate effects.
11 Ensure that planning and design, construction and
post occupancy activity conserves, protects and
makes best use of existing natural systems,
particularly in relation to bio diversity, both within
and adjoining the precinct.
12 Undertake to implement planning and design
decisions that create new habitats inhabited by
indigenous species.
13 Facilitate and support the means by which changes in
behavior will lead to greater sustainability practices
throughout the precinct.
14 Promote the take up by the precincts stakeholders of
sustainable practices regarding energy, water, waste
and transport.
15 Through planning and design ensure appropriate
development form regarding the characteristics of the
site and surrounding area: access, proximity to
amenities, and permeability to promote walking, use
of public transport, useful open space and community
security.
The outcomes from the proceeding key strategies should raise the environmental standards of
the new precinct and make a contribution to sustainable development targets and the reduction
of emissions that contribute to climate change. They should also establish an outline for
practical steps that can be taken to achieve these higher standards by drawing together the
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 30
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 86.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.