Council archive · source document
Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208
Very large file (86.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Materials sourced from sustainable sources
Electrical protection for office equipment
Insect screening (appropriate to location only)
12 Garage and storage
Provide for’
. Car (off road and drive)
.
Bicycles
. Suitcases
. Power tools and hardware supplies
. Collectables
. Non sensitive paperwork
It should be noted that green building design should no longer be seen as a niche market
activity. It can be a powerful source of competitive advantage in mainstream markets and is
based on sound financial and ethical principles. Increasingly investors are attracted to
sustainability because of superior risk-return profiles and because sustainability can be seen as
an indicator of enlightened and disciplined management. Other benefits achieved on green
building projects in the residential/commercial sector include:
Substantially reduced operating costs (energy, water, maintenance) for tenants;
Making possible a premium on leasing fees;
Improved occupant comfort and a healthier working or leisure environment;
Future-proofing against the risk of tightening environmental regulation; and increased
Resource costs or heightened community, investor or tenant expectations.
It can besuggested that these gains will be common for all the other types of building
provision at Noosa onWeyba which are seen as critical to the precincts success and that
sustainability is an integral part of that recognition. The following checklist seeks to provide a
range of priorities for the planning and design teams of the precincts many other building
types.
Precinct Sustainability at Noosa on Weyba Queensland
Other Building Types Sustainability Checklist
-
Comments -/ or x
1 Planning, design and management approach
There is a full understanding of the range of costs and
benefits associated with green buildings.
There is a vision statement for the individual project,
supported by specific performance objectives.
A ’whole-of-system’ optimisation is a key element of the
individual project.
All contracts are to state the project vision, specific
objectives and minimum performance required.
The individual project manager is to be directly responsible
for environmental performance.
Training and induction procedures to be introduced to
ensure all contractors and subcontractors are willing and
able to realise the proiect vision throuqh their contribution.
2 Location:
Discernable centre of the precinct or neighborhood
Close to residential properties
Access to public transport and road networks
Access to pedestrian cycleways and footpaths
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 47
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 86.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.