Access to recycables collection and storage areas
3 Siting, landscape and orientation
Site and climate responsive design
Use dimensional control grids in design layout
Minimise cut and fill operations on site by design
Store all existing topsoil for reuse
Buildings not to overshadow adjoining properties
Solar access study to be undertaken for site
Maintain solar optimized distances between properties
Retain existinq trees and veqetation
Reduce carbon emissions on site by planting
Use vegetation for shade and insulation
Use native species only
Use qround cover and shade to reduce heat reflection
Create self sustaining landscaping
Create habitats for mixed native bio diversity
Use organic or plant species to control pests
Use orqanic fertilizer compost and mulch
Unroofed or covered paving areas minimised
Porous materials used on external paths and mall areas
Contamination catch pits used in parking bays
Desiqn water conservation systems into landscape
Use harvesting of rain water for landscaped areas
Windows accessible to northern sunliqht
Prevailing breezes to be captured by openings
Natural cross ventilation incorporated in mall layout
Sun shading to shop windows and public verandahs
Insulate for all heat and noise sources
Views of adjoining properties to be considered
Privacy of adjoining properties to be considered
4 Access
Easy access for people of all abilities
Good lighting to entry ways and external car parking
Easy access for goods delivery
Safe pedestrian, bicycle and vehicle access to site
Wide doorways and corridors throughout
5 Safety
Security to doors and windows
High visibility throughout mall areas inc. parking zones
Slip resistant access ways pedestrian walkways
Smoke detectors and firefighting measures
6 Operation, materials and maintenance
A best practice site manaqement plan to be implemented.
Chemical Use Management Plan to be implemented
Water meters to be installed for major activities
Eliminate all internal mechanical system sources
Low embodied energy materials to be used
Avoid all PVC materials
Use recycled materials i.e. concrete for site works
Use lightweight construction systems i.e. steel
Use prefabricated components and materials
Use mechanical fixings for fleXibility
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 48
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 86.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.