Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                          Page 6




5.4     Vegetation Management and Weed Control
Conventional surface mulching of the bio-retention basins with organic material like tanbark,
should not be undertaken. Most organic mulch floats and runoff typically causes this material to
be washed away with a risk of blocking drains.

If weeds are observed within the bio-retention basin they shall be removed. Weeding will
generally involve manual removal of the species.

Vegetation planting densities are to be in accordance with the Landscape Architect’s design.
Where necessary a biodegradable erosion mat can be applied the basin batters to help combat
weed invasion and reduce the labour intensive maintenance requirements for weed removal.

Herbicides are not recommended as a means of weed control. If required, however, their
application is to be managed to avoid unintentional destruction of other vegetation or the
introduction of chemicals that may contaminate the stormwater runoff.

Where necessary, in areas that have been extensively weeded, the bio-retention basin shall be
replanted with similar planting densities using suitable native species in accordance with the
Landscape Architects design.

Inspection of the existing vegetation is to take place and any dead or diseased vegetation shall
be removed and replaced with suitable native species in accordance with the Landscape
Architects design.

The removal of plants, dead or diseased vegetation or weeds shall be disposed offsite at an
appropriate waste management facility.

All litter and debris present on the surface or batters of the bio-retention basins shall be
removed and disposed offsite at an appropriate waste management facility.


5.5     Validation Water Quality Testing
Validation water quality testing is not proposed for the site.


5.6     Equipment Needs
The equipment required to undertake regular maintenance to the bio-retention basins will be
standard hand held landscaping tools. No specific mechanical equipment is expected to be
required for the maintenance of the basins unless resetting is required (refer Section 5.11).


5.7     Occupational Health and Safety
The maintenance activities are to be undertaken in accordance with all current occupational
and workplace health and safety legislation, regulations, codes of practice or manufacturers
guidelines.




Bio-Retention Basin Operational Management and Maintenance Guideline
Log in to download the original file

Site Based Stormwater Managment Plan.pdf · 13.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.