Site Based Stormwater Managment Plan
The original of this document is very large (13.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnPage 7 For maintenance access the shallow nature of the bio-retention systems enables pedestrian ingress. As noted above no mechanical equipment is required unless resetting is required. The batter grades are considered to be acceptable and do not pose an occupational health and safety issue given proper training to maintenance personnel. The application of pesticides or herbicides in response to any weed outbreak, which cannot be controlled via manual removal, is to be undertaken by maintenance personnel in accordance with manufacturer’s guidelines in consultation with the Landscape Architect. Protective measures are to be implemented so as to minimise exposure to personnel, with personal protective measures to be the final hierarchical option. 5.8 Public Safety While maintenance is being undertaken consideration of pedestrians and cyclists is to be made due to the close proximity of the footpaths. To avoid any safety concerns it is recommended that temporary warning signs be placed at a sufficient distance to allow pedestrians and cyclists to become aware of possible maintenance vehicles/personnel when maintenance is being undertaken. 5.9 Disposal Requirements The removal of litter and debris, plants, dead or diseased vegetation or weeds are to be disposed offsite at an appropriate waste management facility. 5.10 Access Issues Suitable access to the bio-retention basins can be achieved directly from the internal road network within the site. 5.11 Bio-Retention Basin Resetting Resetting (i.e. complete reconstruction) of the bio-retention basins will be required if the system fails to drain adequately after tilling of the surface. Replacement of the filter media is required when it becomes 50% blocked, which is estimated to occur approximately every 8 to 10 years. This can be assessed via a review of sediment build up and the time necessary for the system to drain or by in-situ falling head permeability tests of the filter media. Bio-Retention Basin Operational Management and Maintenance Guideline
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.