Topaz Street Op Works · OPW11/0320
Attached to the e-mail Revised Drawings showing the driveway.
OPEN CONCRETE BLOCKS
GRAVEL FILTER
SANDBAG OVERLAP.
RB
ONTO KEI 4.0m_MIN.
600mm (NOM) GAP
BETWEEN SAND BAGS
ACT AS SPILLWAY
THREE LAYERS OF
SANDBAGS WITH ENDS
OVERLAPPED.
DOWN STREAM GULLY PROTECTION DETAILS
NOT TO SCALE
BURY THE TOP OF THE PLASTIC
IN TRENCH MIN 300mm _ DEEP.
STAPLE AT 150mm CENTRES.
COMPACT SOIL OVER BLANKET
CENTRELINE SECTION AT POINTS “A”
FILL TRENCH WITH SOIL
AND COMPACT
OVERLAP—BURY UPPER END OF
LOWER BLANKET AS IN “A”. OVERLAP
END OF TOP BLANKET 300mm AND
STAPLE AT 150 CRS.
APLES: 8 GAUGE
(4mm) WIRE
CENTRELINE SECTION AT POINTS “B”
[nae
“4
STAPLE BLANKETS
AT GRID OF
1m CENTRES
STAPLE OUTSIDE EDGES
AT 300mm CRS.
CLEAN/DIRTY DIVERSION DRAINS
DIVERSION DRAIN CONSTRUCTION NOTES
. REMOVE ANY ROCKS, CLODS, STICKS OR GRASS FROM THE SURFACE BEFORE LAYING PLASTIC.
. ENSURE THAT TOPSOIL IS AT LEAST 75mm DEEP.
. ENSURE PLASTIC WILL BE CONTINUOUSLY IN CONTACT WITH THE SOIL BY GRADING THE SURFACE
CAREFULLY FIRST.
. LAY FABRIC IN "SHINGLE FASHION”, WITH THE END OF EACH UPSTREAM ROLL OVERLAPPING THOSE
DOWNSTREAM. ENSURE EACH ROLL IS ANCHORED PROPERLY AT ITS UPSLOPE END.
. ENSURE FULL WIDTH OF FLOW CHANNEL IS COVERED BY THE PLASTIC.
Unbound pavement material (gravel) to Grading
B, Table 9 of QT Specification MRS11.05,
exclude material finer than sieve 2.36mm
GEOFABRIC FABRIC, BIDIM A34
OR SIMILAR
e
RUNOFF TO BE DIRECTED TO A SEDIMENT TRAP,
REFER STANDARD DRAWING D—0041.
TEMPORARY ENTRY/EXIT CONSTRUCTION NOTES
. STRIP THE TOPSOIL, LEVEL THE SITE AND COMPACT THE SUBGRADE. 5.
. COVER THE AREA WITH NEEDLE-PUNCHED GEOTEXTILE.
|. CONSTRUCTION A 200mm THICK PAD OVER THE GEOTEXTILE USING ROAD BASE OR 30mm.
. ENSURE THE STRUCTURE IS AT LEAST 15m LONG OR TO BUILDING ALIGNMENT AND AT
RUNS
go
SEDIMENT AND EROSION CONTROL
DETAILS
ALL EROSION AND SEDIMENT IN ACCORDANCE WITH IN ACCORDANCE WITH
WITH MAROON BOOK MANUAL FOR EROSION AND SEDIMENT CONTROL
UNDISTURBED AREA
GEOTEXTILE STAKES
FILTER Fi
STAKES,
RUNOFF WATER
WITH SEDIMENT
=
GEOTEXTILE —
FILTER FABRIC
BURIED FABRIC FUTERED
GEOTEXTILE INLET FILTER
GEOTEXTILE INLET FILTER CONSTRUCTION NOTES
1. FABRICATE A SEDIMENT BARRIER FROM GEOTEXTILE.
2. FOLLOW DETAIL FOR SEDIMENT FENCE FOR GEOFABRIC
INSTALLATION. REDUCE PICKET SPACINGS TO 1m CENTRES.
3. DO NOT COVER THE INLET WITH GEOTEXTILE UNLESS THE
DESIGN IS ADEQUATE TO ALLOW FOR ALL WATERS TO
BYPASS IT.
Geotextile fabric, —~
Bidum U34 or similar
Zz &
Runoff from pad directed to sediment trap
TEMPORARY CONSTRUCTION ENTRY/EXIT SEDIMENT TRAP
Not to Scale
CATTLE GRID 3.0m NOM WIDTH
SET 300mm ABOVE GROUND
a
TEMPORARY ENTRY/EXIT 3.
LEAST 3m WIDE.
. WHERE SEDIMENT FENCE JOINS ONTO THE STABILISED ACCESS, CONSTRUCTION A HUMP OR
GRATE IN THE STABILISED ACCESS TO DIVERT WATER TO THE SEDIMENT FENCE.
DROP INLET
WITH GRATE,
_
500mm TO afonm
VV
DISTURBED
AREA
STAKES DRIVEN INTO GROUND ~
s
Xe
Na
—_
GEOTEXTILE FILTER FABRIC
—_
—
—_] HOLD IN PLACE.
WITH SAND BAGS:
—_, GEOTEXTILE FILTER SOCK
FILLED WITH 25MM GRAVEL
KERB INLET PIT SEDIMENT BARRIER
1.5m TIMBER STAKES
AT MAX 2.5m CENTRES
SELF—SUPPORTING
GEOTEXTILE:
DIRECTION OF
FLOW
ON SOIL, 150mm x 100mm
TRENCH WITH COMPACTED
BACKFILL AND ON ROCK, SET
SECTION DETAIL INTO SURFACE CONCRETE
KERB INLET PIT SEDIMENT BARRIER
CONSTRUCTION NOTES
1.
FABRICATE A SLEEVE FROM GEOTEXTILE OR WIRE MESH
LONGER THAN THE LENGTH OF THE INLET PIT AND FILL
WITH 25mm TO 50mm GRAVEL.
FORM AN ELLIPTICAL CROSS—SECIRCUITION APPROX.
HIGH, 400mm WIDE.
PLACE THE FILTER AT OPENING LEAVING AT LEAST
100mm BETWEEN KERB INLET AND SLEEVE. MAINTAIN
OPENING WITH SPACER BLOCKS.
FORM A SEAL WITH KERB TO PREVENT SEDIMENT
BYPASS.
SANDBAGS FILLED WITH GRAVEL CAN SUBSTITUTE FOR
THE MESH OR GEOTEXTILE PROVIDED THEY ARE PLACED
SO THAT THEY FIRMLY ABUT EACH OTHER AND
SEDIMENT LADEN WATERS CANNOT PASS BETWEEN.
150mm
vi»
NV DIRECTION OF" FL
V Vv V
1.5m TIMBER STAKES
AT MAX 2.5m CENTRES.
SEDIMENT FENCE
NOTE: POINTS @ AT SAME
ELEVATION
SEDIMENT FENCES
Sediment Fence installed across the contour
- uncontoured concentration of flow should be avoided
NOT TO REGULAR SCALE
sSEDIMENT FENCE CONSTRUCTION NOTES
1. CONSTRUCTION SEDIMENT FENCES AS CLOSE AS
POSSIBLE TO BEING PARALLEL TO THE CONTOURS OF THE
SITE, BUT WITH SMALL RETURNS. THE CATCHMENT AREA
SHOULD BE SMALL ENOUGH TO LIMIT WATER FLOW IF
CONCENTRATED AT ONE POINT.
2. | CUT A 150—mm_ DEEP TRENCH ALONG THE UPSLOPE
LINE OF THE FENCE FOR THE BOTTOM OF THE FABRIC TO
BE ENTRENCHED.
3. DRIVE TIMBER STAKES INTO GROUND AT 2.5m
INTERVALS (MAX) AT THE DOWNSLOPE EDGE OF THE TRENCH.
4. FIX SELF—SUPPORTING GEOTEXTILE TO THE UPSLOPE
SIDE OF THE POSTS ENSURING IT GOES TO THE BASE OF
THE TRENCH. FIX THE GEOTEXTILE WITH WIRE RECOMMENDED
BY THE MANUFACTURER. THE USE OF SHADE CLOTH FOR
THIS PURPOSE IS NOT SATISFACTORY.
5. JOIN SECTIONS OF THE FABRIC AT A SUPPORT POST
WITH A 150mm OVERLAP.
6. BACKFILL THE TRENCH OVER THE BASE OF THE FABRIC
AND COMPACT IT THOROUGHLY OVER THE GEOTEXTILE.
giz <x
a
a
&
3 wn
Sle O
un |.7 |B
« |B xo
z |2 c
s |Z Ww
+ 5 |S
2 |2 |g=
& |— |s =
Wn
al
iy
a
o| =
aoa| =a
zt} Oo
4
2| 3
S| So
S| sw
= ~
=| SH
aw
S| 4
N
a
a uty
Aa
Kl oo 2
SJ ae &
s|2£&.86
eJa lo
>
Ww)
x
So
oO
rE
Wn
©, 2
@ =\5
&
tin
&
a |"
o
a/il~+
aia
|z
a
LINDSA Y CONSULTING [7 |
STRUCTURAL AND CIVIL
OFF. 2C/82 PARKER STREET/MAROOCHYDOR
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Topaz Street Op Works.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.