Topaz Street Op Works · OPW11/0320
Attached to the e-mail Revised Drawings showing the driveway.
CONSTRUCTION
MANAGEMENT PLAN
Performance Item Performance Indicator
Indicators
- Vegetation No disturbance of soil below retained vegetation due to construction activities.
2. Hours of Work No work conducted outside specified hours without satisfactory evidence of mesures
taken to suppress noise and other emissions / dust.
3. Lighting No resident's complaints regarding construction security lighting.
4. Busting Roads No abutting public roads contain soil, gravel, clay or other such materials originating
from onsite construction activities.
5. Signage No observed or reported incidents due to inadequacy or gdsence of signage or other
control measures.
6. Waste Control No complaints from local residents and site is kept tidy at all time
\ No occurrence of illegal dumping onsite and all materials where possible have deen
1. Waste Minimisation
appropriately recycled.
8. Dangerous Goods No spillage or seepage of dangerous goods stored onsite.
9. Erosion & Sedimentation No visible signs of sediment laden waters leaving the site.
10. Troftic Management No works are carried out without implementation of the approved Traffic Management
Plan.
11. Existing Infrastructure No unplanned damage to existing utilities and infrastructure.
12. Non Conformances All non conformances have been reported and rectified
The site foreman is to monitor the performance of all construction activities and any departure from the Construction
Monitoring Management Plan control measures be immediately rectifie
The site foreman is to be responsible for all inspections and maintenance of the Construction Management Plan.
Responsible Pel
son
Reporting
The site foreman is to complete t
control) on a weekly basis as a minimum
other special event affecting the
(in conjunction with the Environmental Diary) shail
purposes with each progress claim
he Construction Management Plan Diary (including Environmental Diary for sediment
but also after every significant rainfall event (which causes site runoff) or
site or any watercourses traversing the site. The Construction Management Plan Diary
be completed and delivered to the Superintendent for record and audit
for the construction works.
Corrective Acti
The site foreman is to arrange al
corrective actions, controls and rectification activities, and report on all measures
"Saken in the Construction Management Plan Diary.
CONSTRUCTION MANAGEMENT PLAN DIARY
Weekly Visual Inspection or After Rainfall Event
Project:- Operational Works — Sewer Re—Alignment
Principal:-
Contractor:- S TOOHEY
Location;- 17 TOPAZ STREET, COOROY
Job Ref. No:- 110586 Council File Ref. No.
Date:- [1] Regular Monitoring (Weekly)
Approx Time:- am/pm [J] Special Event Monitoring (briefly describe event)
Item Monitored
Retained Vegetation
Air Emissions
Security Lighting
Vibrations
Condition Corrective Action
Date Control Corrective Action Taken
Acceptable
Measure Installed “ Required {Describe}
v x
Existing Utilities, Roads & Drainage Infrastructure
Construction Traffic & Parking
Waste Minimisation & Recycling
Erosion & Sedimentation Control (Environmental Diary)
Other
Item Monitored
Any Special Comments:
giz <x
a
a
&
3 \o
Sle O
vo |. |B
« |B xo
z |2 c
s |Z Ww
+ 5s |S
2 |2 |g=
& 5s [ —
Wn
al
iy
a
S| =
aoa| =a
zt} Oo
4
2| 3
S| So
S| sw
= ~
|
aw
S| 4
N
a
a uty
Aa
Kl oo 2
SJ ae &
s|2£&.86
eJa lo
>
Ww)
x
So
°
rE
wn
©, 2
@ =\5
&
tin
&
a |"
o
a/il~+
aia
|z
a
LINDSAY CONSULTING #1}
—
INEERS
ZN
STRUCTURAL AND CIVIL
OFF. 2C/82 PARKER STREET/MAROOCHYDOR
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Topaz Street Op Works.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.