Skip to the record
Every meeting, every word.

Council archive · source document

Decision Notice - Change to an Existing Approval - 010.2007.00001586.002 [As Published] · 132007.1586.02

of 8

Text shows just the words. Original shows the document exactly as it was published.

                                                                                               2007/1586

14.    Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be submitted,
       to secure performance of all conditions of this approval, prior to the issue of a Development Permit for
       building works. The cash bond or trading bank guarantee will be returned on performance of the
       conditions of approval less any costs incurred by Council in respect of enforcing performance of this
       permit.
15.    Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings) are not
       constructed under overhead electricity transmission lines, or within any easements.
Demolition or Relocation of Existing Dwelling
16.    Infrastructure including reticulated water, sewerage, stormwater, and electricity are to be protected from
       damage and made safe to the standard required by the regulatory authority;
17.    All infrastructure must be disconnected, capped or sealed including:-
            electricity meters removed and electrical wires disconnected; and
            telephone lines are disconnected; and
            high speed data cables and television provider boxes are disconnected and removed to
             the standard required by the regulatory authority;
18.    All building materials containing asbestos, including asbestos cement sheeting or roofing and lagging,
       must be removed from the building and disposed of in accordance with industry best practice.
19.    Waste generated during construction must be stockpiled in a centralised location and covered as
       required to prevent material being blown onto adjoining properties including the road reserve or food
       waste from generating vermin. All site waste must be disposed of to an approved waste disposal facility
       either directly or via an approved waste receptacle and collection service. Storage areas are to be
       located near the temporary access to the site so that access can be gained with out damage to
       infrastructure.
20.    All building materials containing asbestos products must be disposed on in accordance with industry best
       practice.
21.    A temporary crossing must be provided to protect road reserve infrastructure including kerb and channel;
22.    Any damage to footpaths, street plantings, kerb and channel or roadways at the removal site, the
       relocation site or between the sites must be repaired or reinstated to at least pre-existing conditions.
23.    Sediment and erosion control measures must be placed on site prior to the works commencing and shall
       be maintained until all works are complete. The erosion and sediment control measures shall be in
       accordance with the “Best practice guidelines for control of stormwater on building sites” prepared by
       Healthy Waterways (copy attached or available at www.healthywaterways.org).
24.    All disturbed areas must be revegetated or otherwise stabilised at the completion of the works. Disturbed
       areas are revegetated using species identified in PSP3 – Landscaping Plants and Guidelines.
25.    The transportation of all materials to and from the site must be undertaken in a manner such that no
       particle matter escapes onto a public road. All vehicles carrying out materials either to or from the site
       shall be covered to prevent materials including dust being windblown from the vehicle.
26.    A Waste Management Plan shall be submitted for the demolition to the Land Use Section of Noosa
       Council, prior to the development permit for building works being issued. The Plan shall contain the
       following information:-
       MATERIALS ON-SITE                            DESTINATION
                                                    Re-use and Recycling        Disposal
       Expected    waste   Estimated      volume    On-site    *specify Off-site *specify      *Specify
       materials           (m³)                     proposed reuse or contractor         &     contractor      &
                                                    onsite    recycling recycling outlet       landfill site
                                                    methods
       Excavation
       material
       Green waste
       Bricks
       Concrete
                                                                                              Page 3 of 8

Used in these records

About this file

File size
60 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Change to an Existing Approval - 010.2007.00001586.002 [As Published].pdf · 60 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.