GENERAL COMMITTEE MEETING MINUTES 12 SEPTEMBER 2022
a. a 2 metre wide footpath along one side of Wimmers Lane and
Emerald Street.
b. the resealing of the existing asphalt path fronting the development.
26. Pedestrian and bicycle facilities must be provided for the development and
include:
a. 10 bicycle parking spaces and 5 lockers; and
b. one shower cubicle with ancillary change room.
Stormwater Drainage
27. The site must be provided with a stormwater drainage system connecting
to a lawful point of discharge. The works must be undertaken in accordance
with an Operational Works approval and the Queensland Urban Drainage
Manual, and must include in particular:
a. works generally in accordance with the Stormwater Layout Plan. Fig
1.2 Revision B prepared by Callaghan & Toth dated 6 July 2022;
a. extension of the site stormwater system to accommodate stormwater
from the existing external drainage pipe from Lot 2 on RP44101 to
the east; and
b. the use of gravity stormwater drainage and not surcharge pits.
This condition is imposed pursuant to s145 of the Planning Act 2016
being non-trunk infrastructure.
Services
28. Underground reticulated electricity and telecommunication services must
be provided to each lot in accordance with an approval for Operational
Works and the standards and requirements of the relevant service provider.
29. Unless otherwise stipulated by telecommunications legislation at the time
of construction, the development must be provided with all necessary
conduits, pits and pipes to accommodate the future connection of optic fibre
technology telecommunications.
30. Certification must be submitted to Council from all relevant service
providers (Energex, NBN and Unitywater) which certifies that the
development has met the requirements of this Decision Notice and all
applicable legislation at the time of construction.
Easements
31. A 1.5 metre wide easement for stormwater drainage purposes must be
registered against the title of the property in favour of Lot 2 on RP44101
and be generally in accordance with the Stormwater Layout Plan. Fig 1.2
Revision B prepared by Callaghan & Toth dated 6 July 2022. The easement
must be of sufficient width to wholly encompass the drainage infrastructure
and extend to the Emerald Street boundary.
32. A 2.0 metre wide easement for “Public Thoroughfare” purposes must be
registered against the title of the property in favour of Council. The
easement must be located directly adjacent to the eastern property
boundary and extend for the full length between Wimmers Lane and
Emerald Street. The easement must be:
a. clearly shown on all plans submitted for Operational Works; and
b. registered prior to the commencement of the use.
Page 7 of 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.